Building Hamilton 230 with mimosa homes
raise a case:
https://www.consumer.vic.gov.au/housing ... and-delays
One of my friends has lodged one against mimosa .
Building Hamilton 230 with mimosa homes
I do want to mention that they are good in some estates... I saw someone's house being completed in 3 months in woodlea. So i guess it depends on your…
Building Hamilton 230 with mimosa homes
It was Dave Roberts then Michael then Aleks and now Luke..
Building Hamilton 230 with mimosa homes
had my PCI on 8th NOV.. Darbecca guy found a lot of defects including one which would take a long time to fix ( door not aligned with ceiling) .…
Building Hamilton 230 with mimosa homes
Still no news . i am at breaking point because they have been lingering on PCI for a while now. Will be writing a review on product review for sure…
Building Hamilton 230 with mimosa homes
Since august my site supervisor has changed twice and works have really slowed down. This new guy keeps telling me that its all complete but when i visit the site…
Building Hamilton 230 with mimosa homes
not i have only planned to engage Darbecca at PCI stage
Building Hamilton 230 with mimosa homes
I have just had a second change of Site Supervisor which is not good. House is almost completed with just little things left like carpet and cleaning. I don't understand…
Building Hamilton 230 with mimosa homes
office update : they told me flooring will be done this week along with washroom fixings.
Building Hamilton 230 with mimosa homes
To my surprise : Tiling has finished this week along with all electrical fittings.
Building Hamilton 230 with mimosa homes
1020X2040 door. attaching the floor plan.
Building Hamilton 230 with mimosa homes
Items still pending :
-Front rendering
-WIP shelves installation
-Carpeting and floorboards installation.
-All Electrical fixings ( switches, Evap cooling and heating ducts, LED downlights, kitchen appliances)
-Bathroom fixtures ( shower installation, toilets…
Building Hamilton 230 with mimosa homes
Things are going along pretty smoothly. Fingers crossed it might complete in September.
House is locked up and I can't go inside. Took a few pics from outside.
Paint Completed. Garage…
Building Hamilton 230 with mimosa homes
Apr 09, 2018 11:58 am
I am building with mimosa homes and want to take you guys through my journey.
Key Dates update:
Contract signed for lot : march 2017
Contract signed for…
Building Hamilton 230 with mimosa homes
No I will only do the last inspection which is PCI (post completion inspection) .
Building Hamilton 230 with mimosa homes
They are a bit slow at site starts but overall it has not been that bad. All the builders charge almost the same amount of money.
I will only do PCI…
Building Hamilton 230 with mimosa homes
Some pics of work in progress !!
Building Hamilton 230 with mimosa homes
Weekly update 22/06 :
Bricklayers are working on site. They will finish work by next week (weather permitting). Insulation batts were also installed. Dry walls to go in next. Seems like…
Building Hamilton 230 with mimosa homes
Weekly update:
They have installed evap cooling and heating. Electrical.nbn and plumbing rough-in was complete as well. Bricks were delivered to site but they haven't started laying them yet.
Happy…
Building Hamilton 230 with mimosa homes
Went to site on Saturday 2/06. Roof tiles have been laid. This week they will install evaporative cooling and start with brick works.
Building Hamilton 230 with mimosa homes
Went to see the SS for first time. Framing is complete. Hopefully if things go as planned they will start roofing next week. Hoping to reach lockup stage by end…
Building Hamilton 230 with mimosa homes
I have seen simmonds and carlisle start as early as one month after settlement.
Building Hamilton 230 with mimosa homes
they emailed me once it was already poured.
Building Hamilton 230 with mimosa homes
Finally some good news to share:
Key Dates update:
Contract signed for lot : march 2017
Contract signed for house: september 2017
Lot settled: 15 Feb 2018
Geo Survey Report: 28 Feb 2018
Building permit was…
Building Hamilton 230 with mimosa homes
No update from Mimosa yet on slab..They did complete piers when I visited last week on 8th May. I emailed my admin support but she has not replied yet.
Building Hamilton 230 with mimosa homes
Key Dates update:
Contract signed for lot : march 2017
Contract signed for house: september 2017
Lot settled: 15 Feb 2018
Geo Survey Report: 28 Feb 2018
Building permit was issued on 28 Mar 2018
Site…
Building Hamilton 230 with mimosa homes
Finally the safety fence is on site.
Building Hamilton 230 with mimosa homes
UPDATE : I visited my site on Saturday and found I was informed incorrectly about things being delivered to my site. No work has been started on site yet. Remember…
Mimosa homes
All the dates are mentioned above... Land titled on 15th Feb and slab expected mid to end of may.