1 year1 yearwayfarerwayfarer posted:
Should Agi pipe be connected to Stormwater or frontyard lawn

Tree roots are mainly on surface so you need approx 300 mm of good soil around the tree for it to get established. To reduce water logging in that area…

2 years2 yearswayfarerwayfarer posted:
Concrete driveway: joint spacing

Hi all
I need a guidance on how far I need to space expansion joints in the concrete driveway and its type (keyway/foam.)
Contraction joints are at 3m max for a…

2 years2 yearswayfarerwayfarer posted:
Slab for retaining wall: advice needed

Thanks for your reply
Started to get interesting.
The story is: the builder created plans for the house, the retaining wall is by the owner (me). The retaining wall was engineered by…

Slab for retaining wall: advice needed
2 years2 yearswayfarerwayfarer posted:
Slab for retaining wall: advice needed

Engineering provided a generic dimensions, no offset from house or fence is given... (All shown at the top image )
No rl, just 1m max and three a3 pages of engineering…

Slab for retaining wall: advice needed
2 years2 yearswayfarerwayfarer posted:
Slab for retaining wall: advice needed

Drainage issue: the wall is approx 7m long and straight, no steps. Surface drain pipe is installed in the middle of the run. The intent is to split and taper…

2 years2 yearswayfarerwayfarer posted:
Slab for retaining wall: advice needed

I have signed engineering details for the slab for the retaining wall approved by a certifier. It doesn't show a walkway (75mm thick X 500 wide and 1:20 slope) that…

2 years2 yearswayfarerwayfarer posted:
Slab for retaining wall: advice needed

Hi all,
Can a slab for a retaining wall be incorporated with a walkway / concrete apron around the house as shown below?

Slab for retaining wall: advice needed
3 years3 yearswayfarerwayfarer posted:
Asbestos found in ground during demolition

Same problem here. Demo price skyrocketed.
Did you end up paying the quote?

10 years10 yearswayfarerwayfarer posted:
stop work order

Not quite right.
Read the contract. You have to pay for the work done, no matter how poor it was. You have to serve payment claim from your builder under security…

Joined homeone
29 August 2014

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024