Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
IKEA Wadrobes in all bedrooms
STUDY —
Media Room —-
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Kitchen Final Pics —
Hallway —
Butler pantry—
Stairs —-
Seville 30 - Plantation Homes QLD
How did you go with your Final Inspection? anything major picked up? Did you higher 3rd party Building inspector ?
Mine is on tomo afternoon - I think Dan is coming…
Should I Hire a 3rd party Building Inspector for Final Inspe
Hi There,
I got told by our SS (Plantation homes) that - they will go through 3 times checks and make report for any fixing required but if I organize 3rd…
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Just got a call from Plantation about handover date is now locked in on 26th June
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
In Built Microwave looks really good
I will post some more photos soon as lot going on and 2-4 weeks to go for handover. still waiting on Date to be confirm.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Facade Tile -- We like the left one - Doing it after handover as we have removed the facade tile last minute as tile we have selected is not going…
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Painting Started —
Which Master Bedroom - help me pick!
Go with the Option 6 if you can fit that in your plan
Landscaping / Artificial Grass - Contact (Brisbane West )
Hi There,
Looking for Landscaper who is expert on installing Artificial Grass.
Any Idea on Costing per Sqm (Supply & Install) ?
which size I will be looking at as there are so…
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Ok. This one is more secure.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Its called awning window.
Which builder you going with?
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Happy to help let me know if you need any info around Plantation Homes.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Thanks.
Bottom hasn’t been paint. Top facade is finished. We will get facade feature tiles too on Front pillars.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Facade cladding
Front Door
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Not sure what we put there. I am very bad at interior designing.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Plasterboard is Up —-20-02-2018
Looking at Kitchen & Rumpus from Living
Looking at Living / Dining area from Kitchen
Rumpus - Next to kitchen
Butler Pantry - Next to kitchen
Niche entry hallway
Main entrance (study…
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Lates Pics — Feb approx. Week 10 — Bricks Up
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Windows now delivered
Electrical wiring is in
Looking at Kitchen
Rumpus
Entry Hallway
Electrical Plan Advise + Downlights after handover install?
Hi Did you go mate?
I am so happy now that I managed to negotiate the price Direct with Electrical who is doing all the wiring etc.
I thought I let you…
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
Your looks awesome too. good that you have done the pool now. we are thinking may be later on. short on $$
yeah manged to get 20m frontage and 600sqm so…
First Home - Custom Design in Ipswich - Fireplace & TV
Nice house. Fencing looks great too.
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
15-12-2017 —- Frames are UP for Upper Level
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
12-12-2017 —- Frame Works Started
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
02-12-2017 -- Slab Done
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
01/12/2017 (Morning) --Slab Preparation Started
Building Plantation Trinity Lux Q1 @ Oxley - Brisbane
21st November -- Site Cut
Hi Mate, is your SS - Daniel Murry? are you close to handover yet? Mine is booked for 26th June