Building Monterey Nouveau Q1 MK2 in Taylors Hill
Hi Vikramgiridhar,
Since this is a old thread, I was going through the upgrades you have opted for and wanted to check if you have gone ahead with Atlas Oak from…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Bathrooms to have white plantation shutters and Frontbedrooms will have teak plantation shutters similar colour to timber windows....have gone with fabrics and things in Niddrie as I found them to…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Thank you! Caesar stone- Walnut, over head cupboards- crystal gloss- fossil, rest of the cabinetry- espresso ligna... We went withdarker theme over lighter european oak flooring.
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Thanks Glenn....we found jasper to really blend well with biscotti... Not just down pipes and window frames.., our rear garage roller door is also jasper and it looks well. All…
Henley Homes
Hi Glenn, we have chosen that concept board and our construction is in final stages. You can have a look at pucs our monterey nouveuau q1 at taylors hill in…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
More finishes:
Garage door:
Facade:
Ensuite/ Bathroom feature tiles:
Ensuite:
Bathroom:
Kitchen: no tiled splashback yet.
Front windows:
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hello... Its broadway facade (no upgrade here). Timber doors and windows are rich chocolate stain, bricks are austral biscotti, aluminium windows and down pipes are jasper, and the roof and…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hi Jessica, Thank you. We did not innovate much;)... We used the colours used in various displays! The rear roller door is custom size. Wouldn't cost much. Just ask the…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hi Jessica.... Thank you. Carpet from Harvey Norman eversoft range. Timber- Grand Oak- European Oak from Timber Flooring King.
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
More updates- evap cooling, ducted heating in. Garage doors (rear and front) fitted, tiling in internal doors and shelves in, basins and sinks in, stone benchtops done, door and window…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
We hose the $600 one as we were told the lattter one is not worth it. I could be wrong so worth checking with NBN companies...
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hi All, this is the NBN box installed by Henley. Does it look right?
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hi Kathy, Glad to hear that you are building in Taylors Hill as well. Sahara q2 is a great house. Our house is at fixing stage. May be another 2…
Henley - Monterey Nouveau MK2 Q1 - Narre Warren South
I have PM'd you the procedure. Hope it helps. They are nice selections. All the best with your build. Don't forget to get the independent inspector right from the start.…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
I am sorry Amit. I am in Auckland for work visit. Can't remember the costs as I dont hv tender document/ contract. I hv entered costs that I remember vaguely…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
They started construction at start of Oct 2014 and are at Lock-up stage now. They have finished with insulation and are at plastering stage. They should be finished by december…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
With Bankwest we have submitted the external quotes for flooring, Fencing, Curtains, Driveway and front landscaping separately in the loan application. So the final payment to the Builder should not…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Frame complete. Roof this week!!
Front
Rear
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Hi Amit, The base price when we signed up was 223900. We added another 50k including site costs on top of that. Major additions to base price will be site…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Its 150mm below ground and 100mm above. 50mm packing sand underneath slab touching ground and 0.2mm polyethylene moisture barrier.
Henley Homes
They mentioned that Raft Slab calls for additional inclusions and their fixed price 6 star only covers waffle pod. We had upgraded roof and wall insulation, sarking, eaves all around…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
At last slab prep's finished! Pour tomorrow. Here are some pics:
Entry:
Garage, living and Kitchen:
Bedrooms:
Alfresco:
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Got it checked today pre-pour with Building inspector (Building Expert- Branko). So relieved that everything was OK!! He said he will make recommendations for proper drainage after slab is in.…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
There was big thunderstrorm yesterday night after the above pics were taken.., nervous as hell!! Contacted supervisor and he mentioned that slab is still on schedule!! Is wednesday, the only…
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
Raft slab prep almost there.... Steel goin in tomorrow!
Henley Monterey Nouveau Q1 MK2 in Taylors Hill
At last slab prep started. Bricks arrived already! Here are few photos taken:)