Building the Santorini MK 2 by Masterton Homes
Probably 2 years too late, but you can get the CDC to average out the street frontage of all the houses, or 5 on each side, not just your next…
A Simple guide to building a house - Videos
Thanks. Good to read my videos provide some guide and ideas.
Building the Santorini MK 2 by Masterton Homes
Anything that we could do after hand-over, we did not get M to do, as this allowed us to get multiple quotes and find the best supplier. With our shutters,…
Building the Santorini MK 2 by Masterton Homes
First Gyprock went up on March, keys mid June and we first slept in the house in August. By then we had everything done, including landscaping and driveway.
Masterton Homes - The next thread 4.0
I'm saddened to say I have to depart from this thread. It has been a fantastic experience and new 'friendships' over 2 years since I joined H1, and the information…
Masterton Homes - The next thread 4.0
Wow! that is a long one. Normally 34 weeks, from all the Vilina's being built last year. Have you asked M the reasons why so long? Interesting to find out.
Ours…
Masterton Homes - The next thread 4.0
Once into construction, things normally move fast. Remember, there are some stages where there is a short wait in-between. But over all, most projects finished on or before contract time.…
Building the Santorini MK 2 by Masterton Homes
I do not believe so, not by default anyway.
Masterton Homes - The next thread 4.0
Glad I could help.
Make sure to place a CAT6 point in the breakout room, next to the phone for the ADSL+WiFi, so you can route back and connect the ADSL…
Masterton Homes - The next thread 4.0
Welcome to the thread.
The NBN Ready is simply a cable from the SmartBox to the junction box next to the Telstra junction box, on the side of the house. It…
Masterton Homes - The next thread 4.0
Wow, lots of new houses all going up about the same time.
Congratulations to all who are slabbed!
Masterton Homes - The next thread 4.0
The wood can handle it, but I would get few old towels and dry them up. It may end up creating squeaky noises later on.
Masterton Homes - The next thread 4.0
In our case, we had no electricity connected till we got keys.
Each tradie brought their own generator or battery powered.
Masterton Homes - The next thread 4.0
Ours was brushes for the corners and rollers.
Masterton Homes - The next thread 4.0
2 story houses are normally 34-36 weeks, less holidays and rain days. 26-28 weeks are single story buildings. Unless they have changed, you can correct me.
Masterton Homes - The next thread 4.0
There is around 5-6 week difference between single and double story build. Ours was 7 months to build as double story including 3 weeks break at xmas time.
Masterton Homes - The next thread 4.0
A photo would help to brainstorm about.
I guess it should have been noted on the drawings and your options would have been driveway on the other side (mirrored house plan).
…
Masterton Homes - The next thread 4.0
That was the only item I did not get to document as I did not know when, and when I drove by later that day (as I drove by everyday…
Masterton Homes - The next thread 4.0
You might want to add the room at the other end, next to the stairs, otherwise you will block and darken the room with no windows (unless you add more…
Masterton Homes - The next thread 4.0
Your 'hell' neighbour can give you 200 pages, it is worth nothing. He has to submit it to the council. As long as your build meets all council requirement, even…
Masterton Homes - The next thread 4.0
This is becoming standard clause in any business contract.
Basically, if you have issues, do not rant them here, facebook or on any web site. Resolve the issues with M directly.…
Building the Santorini MK 2 by Masterton Homes
I do not recall having one. Our electricity was connected after handover, so there would have been no point. All work that required electricity was done via cordless or generator.
But,…
Masterton Homes - The next thread 4.0
Ours mounted on the brick, so it sticks out (not that you can see it from the street).
Masterton Homes - The next thread 4.0
I know it has been a while for any post, but not much has changed since we moved in. Some items are still in the boxes, stacked in the garage!
We…
Masterton Homes - The next thread 4.0
Your house is looking FANTASTIC! Good choices of colours.
Not long to go now...
Masterton Homes - The next thread 4.0
So quiet here. Where is everyone gone?
Masterton Homes - The next thread 4.0
Just contact the M head office and request the change in the tender and the credit.
Masterton Homes - The next thread 4.0
Our balcony looks over the front yard of our neighbour, and we have no fence in between them already! But still had to have it. At least it cuts down…
Masterton Homes - The next thread 4.0
Hi Pikey,
We had to have some privacy screen. I'll have to search my papers to find out the price. I'll keep you posted. But I don't think it was that…