6 years6 yearsBuLe posted:
Building with Ausbuild @ Bridgeman Downs
Building with Ausbuild @ Bridgeman Downs
Now at lock-up stage (as at 20 Dec 2018 )
6 years6 yearsIrish16 posted:
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Inside and front door painted.
6 years6 yearsIrish16 posted:
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Aaaaalmost ready...
Lights and powerpoints have been installed, external painting completed, sinks, bath, towel rails, taps and door handles also in.
I think they’re pretty much done for the year, most…
6 years6 yearsIrish16 posted:
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Countertops and sinks have gone in. Front rendered (still to be painted). Downpipes installed. Internal paintwork commenced.
(Please excuse the mess...)
Very happy with how everything is coming together
6 years6 yearsIrish16 posted:
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Building with Ausbuild at Harrington Estate, Bridgeman Downs
Tiling has been done.
Painters are coming in next week.