The parties have reached a mutual understanding in resolutio
The parties have reached a mutual understanding in resolution of each of the other parties concerns
Building the Simonds Cleland 233 in SA
Next will be a nice frame invoice! 🤪. But assuming your inspector ticks it off, I would be guessing scaffolding, eaves/gutter, sarking and roof in that order? How’d you…
Termimesh installed correctly?
Mesh anti-termite material is stuck to internal vertical edge of your concrete slab, extended out under your tiles or brick-work - with bricks, often at second course. Vital that external…
Two Wells Dechellis Build
28.03.2019
Stone benches are in!
Tiling has started and from the peeps I can see from outside looks good.
The dirt that looks likes its all over the tiles is just a…
Expert on Slab Advice please
OT, Technically, the engineer would have specified a round polystyrene (lol,now a dirty word) blockout,
which is easier to remove, round holes don't crack (stress distribution)
Kitchen island.....waterfall or not?
You have to be carefull with sales guys and fashions.
There is a perceived fashion that 20mm stone is "in" personally I only think its in fashion because all the spec…
Kitchen island.....waterfall or not?
You have to be carefull with sales guys and fashions.
There is a perceived fashion that 20mm stone is "in" personally I only think its in fashion because all the spec…
Simonds Cleland in Adelaide
Hi Tysonandkaylie,
I can't speak for Sarahmarie but we are using the cleland as the base for our home design (have made significant changes) and have done the same. We did…