Hey @knockitdown Did they pour all 2DEB's and the slabs all at the same time? I.e. only 1 hire of the concrete pump? Or did they have to pour/use a pump in different stages/days? I.e. pour bottom slab, wait some days, then 1 slab and DEB, then wait and pour another 1 slab and DEB etc?
posted by KnockItDown