Pricing up, appreciate any input please
im missing frame and truss supply as well as hydraulics.
what else am i missing or have i gone too light or too heavy on??
item
units
rate
price
priced from
Engineering (Slab/Frame)
1
2500
2500
inertia engineering
Soil Test
1
500
500
inertia engineering
SUBTOT
3000
Concrete Slab
subgrade…
Metricon Winchester 28- Landscaping
I can't remember if I posted our cellar fitout. We measured up the space under the stairs and got the racking custom made. It fits almost 400 bottles.
We had the…
GJ Gardner - Twin Waters (slightly modified)
Good luck! Things are about to get very exciting 🍾
Madison 35 by Clarendon Homes - Handover!!
So they say there is an allowance for breakages etc... but that sure is some allowance! Maybe our brickies were particularly careful?
Either way, we'll try to minimise waste and…
Inclusions and Plan Drawings
One reason a pre contract inspection is a must,can find mistakes, overcharges, unfair contract clause,tell you with legal certainty what's included,also puts builder on notice,your loaded with knowledge,look at building…