Modified Coral Marcoola 32 SEQ
Only some paint touch ups and two more power points need to be added.
We have been in close contact with everyone onsite and have raised any issue we had immediately.…
Modified Coral Marcoola 32 SEQ
PCI was this morning. All should be good for handover to happen next Friday π
Modified Coral Marcoola 32 SEQ
Exactly!! Donβt think my sister is too impressed. She told me that I can always paint it. I said not likely love, weβd need about 50 coats to cover that…
Modified Coral Marcoola 32 SEQ
Not a white wall in the house haha
It certainly is a different look we are going for, but I am quite happy with it so far
Modified Coral Marcoola 32 SEQ
PCI is booked and confirmed for June 29.
Will post pics when i get a chance
Manhattan 23 - Coral Homes (Week 18: Flooring, Carpet....)
Did you have a drama with your range hood too? They had to upgrade ours to a different brand as there is no technika in stock or something
Coral Homes / Avoca 23 / Handover 6th of August
Now I'm curious what I have....
Building Grange 25 Coral Homes - Northern NSW
Is this a thing? We are always on site when trades are there. They would have missed a lot of stuff if we didn't go up every few days to…
Modified Coral Marcoola 32 SEQ
Had two horrible offers. Waiting for something a bit more reasonable
Modified Coral Marcoola 32 SEQ
Not far at all!!
We are just going with the flow and it will be ready when it is ready.
Hopefully we can sell our current house in the next few…
Modified Coral Marcoola 32 SEQ
Tap hole was in the wrong spot.
Will show you our feature walls when they paint them, will be after everyone has finished
Projected PCI will is June 21
Modified Coral Marcoola 32 SEQ
Some progress pics. Plumbing and electrical fit off happening this week as well as air con connection. Not much left to do
- carpets
- shower screens and mirrors
- redo kitchen…
Modified Coral Marcoola 32 SEQ
Thanks. Was worried about the colour for a while. I will add some new pics today
Modified Coral Marcoola 32 SEQ
Thanks electrical and plumbing fit out should finish up today or tomorrow
Coral Homes - Grange 25 (Newport)
We painted then tiled. Stone was put in before painting. I think it all just depends on availabilities of trades
Coral Homes general build thread
We totally missed the WIP shelving. DH is totally unhappy with the pyneboard, but what can you do....
Coral Homes general build thread
I don't think my OH would cop it. I'm sure it does the job but doesn't look the best
Is it going to be seen or will it be hidden?
Building a modified Grange 25 - Coral Homes - Brisbane
your colours are lovely, I'm sure it will be stunning. Be sure to share some pics when you finally get a look
Building a modified Grange 25 - Coral Homes - Brisbane
So close to the finish!! Your house looks stunning
I think our painters will be finished today and the tiler will be back tomorrow to do all tiles.
They will be finishing…
Modified Coral Marcoola 32 SEQ
Painting has started, benchtops we are on our way!!
Modified Coral Marcoola 32 SEQ
The outdoor kitchen will be against it. Will be the hero of the room $390 for the tiles and $500 to lay them
Modified Coral Marcoola 32 SEQ
In other news, have a pencilled in PCI of June 21
Miami 31- Brighton Homes- Northern Gold Coast
Dear lord. Thatβs enough to break anyone. So sorry Kailie x