4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

So PCI went through well with some minor cosmetic issues identified that needed to be rectified. Somehow Garage door dint work during the PCI so that also needed to be…

  ⋅  3
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Have got the date for PCI I.e. on 20th Jan. Fingers crossed to encounter the minimum issues so the handover can be fast tracked. Site supervisor assured me that he…

  ⋅  1
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

SO house seems almost ready, on 22nd Dec all the trades and Site Super visor dispersed for new year vacation and expected to be back by 10th Jan 2021 onwards.
Have…

  ⋅  2
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Hi Camo, wonderful news that you also on the same journey. It will certainly be a roller-coaster. Yeah Rawson did pretty good job so far, it just the last leg…

  ⋅  1
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 25 Update - flyscreen installed to all doors and windows, Painters did their job on the balcony cedar and down pipes, shower screens installed, fire place installation completed, Driveway…

  ⋅  2
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 24 Update - visited the site today and house seems very much is final shape. So from completion point of view, Tiles and electrical work completed. Bath tub installed…

  ⋅  1
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 20 Update - Received fix out progress payment from Rawson this week. Vanities installed (Kitchen, Pantry, Main Bathroom, En-suites) Stair Case installed, Architraves and Skirting done, External doors installed…

4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

So, I visited our house today. To my surprise the tradeis were working today and sanding the walls preparing it for the 1st coat of paint. Also, realized that stormwater…

  ⋅  1
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 18 Update - Just got the news from the SS that Internal linings now completed !! So it means the claim going to come anytime today/ tomorrow. The fireplace…

  ⋅  1
4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 16 Update - Last week was full of action packed. The wet areas have now been sealed, lower eaves completed, Electrical rough in completed, Balcony Decking & Cedar batten…

4 years4 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Week 15 Update - This week we see good progress. The lower roof tiles are now completed, Lower Fascia and Gutter have also been completed for Ground, Metal roof over…

  ⋅  1
4 years4 yearsCTSCTS posted:
Buidling Davenport 24 by Rawson Homes- Horizon, Marsden Park

Long time lurker - first time poster;
We are building house and land package with Rawson homes in Horizon Marsden Park; We are upgrading to Luxury package with them, and getting…

Buidling Davenport 24 by Rawson Homes- Horizon, Marsden Park
  ⋅  1
4 years4 yearsvin83vin83 posted:
KDR - Rawson Balmoral (Modified) Sydney NSW

Thanks Vin. Frames will arrive soon, but in the mean time the next thing they plan to install is the external drainage. How's your house coming along? Haven't seen any…

  ⋅  1
4 years4 yearsrobw17robw17 posted:
KDR - Rawson Balmoral (Modified) Sydney NSW

Week 4 Construction
Another busy and productive week...
Slab formwork was completed
Waffle pod and slab reinforcing steel installations were completed
Formwork inspections and slab reinforcing steel inspections completed
Slab pour was completed
All this…

  ⋅  1
4 years4 yearsrobw17robw17 posted:
KDR - Rawson Balmoral (Modified) Sydney NSW

Thanks Steve. The preconstruction administration was a real grind, we're looking forward to putting that behind us and seeing it get built.
Thanks Vin. Workshops can never be too big. We're…

  ⋅  2
4 years4 yearsVENGEANCEVENGEANCE posted:
Things you forget - summary page 32

Window heights - Make sure you check all Window heights to ensure they don't look wonky
Measure your floor space. Get a measuring tape and mock your rooms in a…

  ⋅  1
5 years5 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Construction Week 1 - Good news, finally the work has started on site and era of pre-construction has come to end. Visited site on 30th May and saw the little…

  ⋅  2
5 years5 yearsvin83vin83 posted:
Rawson Seaview 36 - Schofields

Finally received email from my PCA at Rawson that pre-construction stage has finally come to an end and the construction files will be formally handed over to the Site Supervisor…

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024