Hot Water (HWS)
It may depend on how you use them and where the bathrooms are located. We have 2, I believe 1 does both the upstairs bathrooms, and the other days…
Hot Water (HWS)
Option 1 says 1 additional HWS. The additional would imply that there is another one in the standard inclusions that this supplements; whereas Option 2 replaces the standard with…
Owner supplied items for new build
We had the builder install junction boxes for some areas where we did lighting after handover. They did the downlights, and we did the feature lights ourselves.
Subwoofer placement inside cabinet joinery
You can get speakers designed to be placed in bookshelves or cabinetry; but I am not sure about doing it with a subwoofer. You will probably want an acoustically…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
We're still happy with the place - nothing falling down around our ears yet. Just stay on top of everything, and insist where it is important to you.
The landscaper…
Stolen Appliances
Our builder did our supplied appliances right at the end for this reason. And he suggested we take out insurance ourselves once they went in (was about 1 week…
Should a building contract be checked by lawyers?
A review may not result in significant changes to protect you better, but it can still be worthwhile. You need to understand your contract, and how to act to…
Custom Build, Pool Tiling pics 21/6/2024
We have ceiling-mounted sheers with a cornice. They can do this where the sheers do not need to track all the way to the side wall. If they need to…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
Hi jamassav.
The defects vary by stage. I would say the main things were:
- Slab: gaps in the formwork leading to areas…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
So, been a busy period. We moved in to our new place on 21 December, and love it. Since I'm bad at taking photos of houses, here are some that…
Building a flame zone house in West Pymble on a steep site
Really happy for you - you deserve every success that you achieve.
Appreciate your support throughout my build, and if you ever start building in Melbourne, let me know and I'll…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
We drove past your place the other night on the way home from Rowville. It looks great!
anchoring to ceiling
If I learned anything on this forum, it's that you should own the plans and get three quotes
Semi-custom 48sq build with Semore Homes (SE Melbourne)
Stairs = $3k extra; balustrades (including around void) = $9k extra
Semi-custom 48sq build with Semore Homes (SE Melbourne)
We are on the home stretch now (finally - it's already overdue). We did a PCI walkthrough today. The house was not fully ready, but the builder wanted…
HIA Contract Clause 16.2 Delays to Carrying Out the Works Af
Excellent post ponzutwo, and especially impressed by your use of "no take backsies" in legal argument!
Key Handover
Your house should come in "as new" condition. It should be clean, and without stains
Contract Works Insurance - Why your builder should have it
Glad you have insurance, but that must be stressful for the poor client. Hope the cleanup goes well and you get it back on track
Semi-custom 48sq build with Semore Homes (SE Melbourne)
Hi,
The difference you're seeing between TA and Semore is larger than what we saw, but there certainly was a decent difference. Keep in mind that our pricing is essentially pre-COVID,…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
Price is in the OP, size is in the thread title.
Landscape construction drawings and process
Yes, they can provide construction drawings.
Yes, you may need to involve an engineer - eg, if you have retaining walls above a certain height, extensive decking, or other structural elements.
Sorry,…
Building Design Certificate Non-Compliance
From a pure legal perspective, if you've signed the variation, it is a very high bar to have it set aside. No-one can give you legal advice on a…
Building Design Certificate Non-Compliance
No, once signed, it's binding.
In any case, if they're doing the work, why not pay them for it? Our builder also "stuffed up" and didn't realise we needed a…
Semi-custom 48sq build with Semore Homes (SE Melbourne)
Hi,
We are between lock-up and fixing stages at the moment. From my perspective, things on the outside of the house (particularly cladding) moved slowly, but there has been a…
My builder made the wrong height door, what should I do next
You need to start with reading it. My contract is the Master Builders Victoria contract, but it has a clause called "discrepancies and ambiguities". This sets out the…
Builder suspended works, demanding variations, cost increase
Only advice I can offer is to document everything. Every call you make, even if unanswered, every discussion you have, write down notes either during or immediately afterwards, and…