Septic tank or expensive new sewer main connection
Hi all,
My 900m2 block in Encounter Bay does not have a sewer main connection point. SA Water had just quoted a 23k construction cost for extend 38m exisiting sewer main…
Cost of raising first floor level elevation
Hi all, would there be any cost saving to raise the elevation of my first floor level by just increase the thickness between ground floor ceiling and first floor level,…
Pre-purchase 'As-if completed' valuation
Hi all,
When it comes to buying land and getting quotes from your builder, does anyone here would enagage a certified practicing valuer (CPV) to do an ''as-if completed'' valuations, based…
Home Builder Grant - Sign contract by 31 Dec 20
Thanks all for the responses. Much appreciated. Hopefully the deadline could be extended, which makes whole lot more senses.
Home Builder Grant - Sign contract by 31 Dec 20
Hi all, just wondering if anyone is waiting your builder drafting your building contract at the moment? How much time would it normally take from initial works contract to signing…
Land Loan and Construction Loan Sequence
Thanks everyone. I found it very useful.
Land Loan and Construction Loan Sequence
Hi all my first post here.
I found a block that I am keen to build my holiday home and currently discussing with my builder with an estimated cost 350k to…