15 years15 yearsProperty Inspections posted:
Urgent Tiling Advice Needed
Urgent Tiling Advice Needed
This is 'sometimes' achieved by tilers slightly varying the thickness of the wall and floor tile grout lines to try and make up the difference over a short wall. But…
15 years15 yearsProperty Inspections posted:
Urgent Tiling Advice Needed
Urgent Tiling Advice Needed
I agree with the last reply, where the floor tiles cannot be made to align with the wall tiles as it just doesn't add up.
I think you should double check…
15 years15 yearsProperty Inspections posted:
building standard for brick work gaps
building standard for brick work gaps
If an independant inspector fines that the brickwork is not up to standards, in their report they will detail why and according to which standard or tolerance set by the…
15 years15 yearsProperty Inspections posted:
building standard for brick work gaps
building standard for brick work gaps
Hi Mark and Ally,
The maximum allowable space in the vertical perpends is 15mm, the maximum space in the horizintal bed joint is 13mm. The standards go into alot more details…
Joined homeone
18 May 2009