rain water run off streaks on render wall
The wall coating is still porous, probably still coming in on top
Can use something like Dulux acrashield paint to provide better coating. Long nap wool roller, 2 coats, have to…
Hebel power floor shutter over long span
Very few frames and joists are engineered for either Hebel wall or floor panels
Often the joist manufacturer supplies a document, not adequate
Check if frame have been designed for hebel, or…
Engineering Drawings for Double Steel Garage?
Plan cost $1500
Engineering cost $1500
About rate for these services
First build- OB - eave board first or hebel first
Hebel first, generally hebel should pass eave line 50-85mm
Frame out eave, sheet and quad
Framing stage non compliant - builder continue work
Is this certifier or an inspector engaged by you
Mimosa Structural Gurantee
Metricon still around
25yr are honoured and is transferred to new owner
Painting over Unitex rendered wall
The closest way to match will be to use Unitex paint
Painted wall will be a little different due to light reflection/absorption
Painting is an upgrade and is better than…
corner stacker door bottom frame height issue
Take out and lower, then fix everything up
Builder refusing complete handover
Did builder give you final payment invoice
then give you a variation invoice on day of handover
Builder refusing complete handover
The contract is over when made final payment
Builder refusing complete handover
How did contract end?
The final invoice payment did not include “variation”
Builder refusing complete handover
Still owe money, living in house?
Mistakes what did your builder do wrong?
Read your contract
Important to understand the process when builder issues final payment invoice
Rendered has covered all the weep holes
Need to seal/caulk windows, doors, penetrations
Designing, Building & Developing a Luxury home in Lindfield
Hi Simeon
You don’t have regular crew for jobs?
Builder refusing complete handover
How does have partial possession?
Builder refusing complete handover
What about state authority (building)
Contract dispute
Builder refusing complete handover
Look at contract for variation section, dispute section, final payment section
All in there and what each party have agreed on
Builder refusing complete handover
Read your contract
All in there what to do, maybe info on partial handover
Stegbar Experience
Have to go harder on builder, bought house from them.
Got you on the merry go round