6 years6 yearsl_vanslyke posted:
H1 slab for H2 class soil
H1 slab for H2 class soil
We do quite a few waffle pod slabs ranging from H1 to H2. There is a difference between the thickness of the concrete used.
A H1 slab uses a 300mm pod…
6 years6 yearsyasir_fnd posted:
Building Hamilton 230 with mimosa homes
Building Hamilton 230 with mimosa homes
To my surprise : Tiling has finished this week along with all electrical fittings.
7 years7 yearsyasir_fnd posted:
Building Hamilton 230 with mimosa homes
Building Hamilton 230 with mimosa homes
Finally some good news to share:
Key Dates update:
Contract signed for lot : march 2017
Contract signed for house: september 2017
Lot settled: 15 Feb 2018
Geo Survey Report: 28 Feb 2018
Building permit was…
7 years7 yearsjmasood posted:
Journey with Mimosa Homes VIC
Journey with Mimosa Homes VIC
Some they fixed. Some still waiting to be done.
The feedback now a days is not good. But do your research first.
My experience has been good when i compare…