Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Likes
oklouise
357 Posts
Gold Member

Follow

oklouise

NSW
Joined 13 July 2020
Gold Member
Following
Followers
4 months4 monthsNativeZenNativeZen posted:
Upstairs floor plan review and suggestions welcome

How about something like this? You'll end up with a larger bedroom, and the main bathroom now opens straight across from the linen closet. The bath is no longer…

Upstairs floor plan review and suggestions welcome
4 months4 monthsxenaxena posted:
Knockdown Rebuild Floor Plan

Thanks again, oklouise. Really appreciate it.

  ⋅  1
9 months9 monthsAshington HomesAshington Homes posted:
I made a big mistake regarding my DA/CC

how did your certifier not pick up on it when he issued CC?
So my DA is approved. Everything is with council now for CC (I went with council as PCA),…

  ⋅  1
9 months9 monthsgommeqldgommeqld posted:
I made a big mistake regarding my DA/CC

The only sensible thing to do is to meet with whoever gave your approvals and figure out how best to rectify the situation.
Do not wait. Face the problem and fix…

  ⋅  1
2 years2 yearsponzutwoponzutwo posted:
Leaving (wet) rooms unfinished in build contract

extension. The house already has occupancy

  ⋅  1
2 years2 yearsLemonmouseLemonmouse posted:
Leaving (wet) rooms unfinished in build contract

first check with whoever approved your plans because you may not be able to obtain your occupation certificate (ie and not be able to move in) without completed wet rooms…

  ⋅  1
2 years2 yearsRosario87Rosario87 posted:
Solar Passive Design Feedback – North Brisbane New Build

the double wide opening for the office is more to create extra space and cross ventilation for the entry which i think is is too narrow and what do you…

  ⋅  1
2 years2 yearsdayas0702dayas0702 posted:
New house design and void suggestions please

hi @, thanks again. It's good recommendation that to enclose the half of staircase for storage (i.e. 2nd flight of staircase). I'm incorporating that in our final design. Cheers.

  ⋅  1
2 years2 yearsalexp79alexp79 posted:
New house design and void suggestions please

Why do you need void to begin with (eating out a lot of extra space, you can easily squeeze extra bedroom there)?

  ⋅  2
2 years2 yearsaussietaaussieta posted:
Spetic tank how often pumped out

Do most people ignore or comply with 3 years, 3 years seems like a short time, why is that necessary
council requires the receipt emailed every 3 years
i think some homes…

  ⋅  1
2 years2 yearsjimbo73jimbo73 posted:
Spetic tank how often pumped out

i have lived with septic tanks in various homes with up to seven people for more than 50 years and never needed to have any of the tanks pumped out....if…

  ⋅  1
2 years2 yearsfhbnewbiefhbnewbie posted:
Floor Plan Feedback

WOW! Thank you so much for taking the time to draw up your recommendation, really appreciative!
I definitely like your layout more, and it also utilizes the natural light with the…

Floor Plan Feedback
  ⋅  1
2 years2 yearskennyckennyc posted:
Garage size questions

My garage is 7 wide X 6.5 deep. I saw how small they make double garages these days and it was the first thing I modified and made bigger

  ⋅  1
2 years2 yearsstrannikstrannik posted:
Garage size questions

Go as wide as your wallet/lot allows, and at least 6m long. You want people to be able to park reasonably sized SUV in there, and if you don't own…

  ⋅  1
2 years2 yearsNonameNoname posted:
Best way to ventilate garage?

i 100% agree. We have an LG washtower taht has a 10 star condensor dryer in it. Weve used it almost daily and sometimes several loads in a day and…

  ⋅  1
2 years2 yearsorionnebulaorionnebula posted:
double garage conversion to multi function area

You'll probably need to talk to your council first as you'll be trying to convert a non-habitable area into a habitable one. You'll likely need to do a Development Application…

  ⋅  1
2 years2 yearsSawyerSawyer posted:
Fitting a second bathroom - Floorplan feedback

Great, thanks for the feedback! We're trying to tee a few things up remotely while temporarily working interstate, so the full dimensioning won't be immediate to get a hold of.

  ⋅  1
2 years2 yearsREDBRICKREDBRICK posted:
Fully off grid new home build

having built on acreage my thought include 1. do all the earthworks first and as well as the standard earthworks for the house, sheds, septic tanks and drainage also make…

  ⋅  1
2 years2 yearsdanreevedanreeve posted:
Buying advice - complicated proposal

Hi oklouise,
Thanks for your reply, to answer your questions:
1 - Lets say the purchase price is $2.5m, then we can comfortably mortgage 50% of that at approx $1.25m. We…

  ⋅  1
2 years2 yearsFamily ManFamily Man posted:
DIY plan sanity check

I had the alfresco/garage set up like this at one stage, my wife overuled it due to blocking the views when in the alfresco. I was even open to…

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024