Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Oakland Projects
38 Posts  ⋅  VIC
Oakland Projects
38 Posts
Junior Member

Follow
38Posts1LikeMost Active Topics

Oakland Projects

VIC
Joined 15 January 2022
Junior Member
2 years2 yearsOakland ProjectsOakland Projects posted:
Durability of hebel power floor

If all you are after is a temporary protection for the Hebel PowerFloor, screwing the 8mm or 12mm plywood to it should do the job.
Alternatively, you can also use…

2 years2 yearsOakland ProjectsOakland Projects posted:
Structaflor / Yellow Tongue - Water Damage?

Yeah we also had yellow tounge on the previous project and I also don't think they are that durable especially if they are exposed quite a bit during rain season.
With…

2 years2 yearsOakland ProjectsOakland Projects posted:
Building & Developing A Duplex In North Ryde

Generally the frame fabricator will engage an engineer to certify the design, inspect the frames once they are built and issue the frame inspection certificate. At least that's what happened…

  ⋅  1
2 years2 yearsOakland ProjectsOakland Projects posted:
Building & Developing A Duplex In North Ryde

Hi Simeon,
Interesting that in NSW the crane charges are not part of the contract. In VIC (at least with our supplier), the crane charges are baked into the pricing. And…

Building & Developing A Duplex In North Ryde
  ⋅  1
2 years2 yearsOakland ProjectsOakland Projects posted:
does anyone know the cost of a screw pile?

We used a company called Solidity in Thomastown. They did a really good job with the install.

2 years2 yearsOakland ProjectsOakland Projects posted:
Facade/window colours - Monument or black?

No we haven't experienced it ourselves since we are using light roof color, anticon and R7 insulation. But our roof plumber has installed a few dark color roof due to…

2 years2 yearsOakland ProjectsOakland Projects posted:
Facade/window colours - Monument or black?

Are you going to have roof tiles / metal roof? If metal, I suggest to stay away from dark color as it will heat up your roof space considerably and…

2 years2 yearsOakland ProjectsOakland Projects posted:
does anyone know the cost of a screw pile?

All depends on where you are, site access, what sort of rating on the screw piles, the length of the screw piles and how many you need. The more screw…

  ⋅  1
2 years2 yearsOakland ProjectsOakland Projects posted:
Frameless Shower Screen Installation

A few hundred bucks to find out where the pipe is located is nothing compared to the cost to rip out the whole bathroom if they drilled into the pipe.

2 years2 yearsOakland ProjectsOakland Projects posted:
Frameless Shower Screen Installation

Alternatively you could get a thermal camera and use it while turning on all the taps / shower / flushing toilets. It will tell you exactly if there are any…

2 years2 yearsOakland ProjectsOakland Projects posted:
Building & Developing A Duplex In North Ryde

Hi Simone, I hope you've budgeted enough for the screws and timbers required to finish steel frames. We've just finished the frame stage ourselves and we churned through screws like…

2 years2 yearsOakland ProjectsOakland Projects posted:
Framing Stage Defects

In Victoria, frame stage is one of the mandatory inspections needed to be done by the building surveyor. You can ask your builder whether the frame inspection has been done…

  ⋅  1
3 years3 yearsOakland ProjectsOakland Projects posted:
Reporting an issue we've sen on site but shouldn't go onsite

Are the feature tiles that were installed wrong in the shower area or outside the shower area?
If it is inside the shower area, it could be a massive work as…

3 years3 yearsOakland ProjectsOakland Projects posted:
Structaflor / Yellow Tongue - Water Damage?

This is the information from Structaflor website.
Exposure, Storage & Handling
STRUCTAflor may be exposed to the weather for up to 5 months, however it is always advisable to enclose the building…

3 years3 yearsOakland ProjectsOakland Projects posted:
Scraping a vacant block

Get a bobcat operator / hire dingo if you want to do it yourself. Cost will depend on the area you live in.

3 years3 yearsOakland ProjectsOakland Projects posted:
EPS Foam vs Hebel cladding on upper level

EPS is combustible meaning that in the event of a fire, it will contribute significantly to the spread of fire. Yes it costs less than Hebel, but in about 5…

  ⋅  1
3 years3 yearsOakland ProjectsOakland Projects posted:
Styrofoam showing through foundation slab, how bad is this?

Yeah it looks like a waffle slab. It needs to be rectified ASAP and ask the builder to ensure that the soil around the perimeter of the house are graded…

3 years3 yearsOakland ProjectsOakland Projects posted:
Hebel Power Floor

We are currently doing 75mm Hebel PowerFloor with plywood on top on steel frames in VIC and we found that the whole frames and joists need to be stiffened to…

  ⋅  2
3 years3 yearsOakland ProjectsOakland Projects posted:
Builders Range and Variation

In-wall cistern is one of those things that needs to be communicated to the builder at tender stage.
They generally require a stud opening of around 600mm width x 1500mm height…

3 years3 yearsOakland ProjectsOakland Projects posted:
Builders Range and Variation

Have you started construction yet? What stages is the construction currently?

3 years3 yearsOakland ProjectsOakland Projects posted:
Builders Range and Variation

There are shortages to certain types of taps / vanity / fittings at the moment. Maybe the builder is worried that if he accepted the variation and the items…

3 years3 yearsOakland ProjectsOakland Projects posted:
Site Scrape Options

You will need to get in contact with council to get the LPOD Report. Some council requires you to pay to get this report.
If the LPOD is to the road,…

3 years3 yearsOakland ProjectsOakland Projects posted:
Site Scrape Options

LPD / LPOD = Legal Point of Discharge
This determines where the stormwater discharge from the property out to either council drain / the road. If it needs to go out…

3 years3 yearsOakland ProjectsOakland Projects posted:
New Construction - wrong size window and door

Based on experience, in VIC most building surveyors only spend between 30 mins - 1 hour per inspection. They normally only pick up issues that are structural related. Unfortunately the…

3 years3 yearsOakland ProjectsOakland Projects posted:
EPS Cladding Metricon

In VIC, EPS is banned for any building greater than 2 storeys. As a result of that, they are mainly used by residential builders for second storey cladding. A small…

3 years3 yearsOakland ProjectsOakland Projects posted:
Lot boundary wall

You will be within your rights to ask for the full plans. The plans are part of the advertising process.
Zero lot wall and lot boundary wall generally refers to the…

3 years3 yearsOakland ProjectsOakland Projects posted:
possible plumbing fail on new build

In VIC, between $450 - $600 depending on the consultant used.

3 years3 yearsOakland ProjectsOakland Projects posted:
Build cost predications post 2022

The current construction cost is unsustainable in the long run. I know a lot of people who bought the land in SE Melbourne last year and decided to not develop…

  ⋅  1
3 years3 yearsOakland ProjectsOakland Projects posted:
Overhead Powerline Cost for New House

The crane and traffic management cost sounds reasonable albeit a touch on the high side. The $7k cost really depends on the condition of your permit. I know builders who…

3 years3 yearsOakland ProjectsOakland Projects posted:
Feb 2022 - Is there shortage of bricklayer in NSW currently?

Simone, out of curiosity, what is the "app" name? Do you mind PM me?

Most Active Topics

More
Joined homeone
15 January 2022

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024