Mojo Homes
Again its going to depend on the size of the kitchen...
to upgrade from standard to sheen finish was $1200 or so. I think the createc was going to be…
Mojo Homes
To upgrade from standard range to next level was "a few hundred". It will obviously depend on the size of your benches and if you also upgrade the bathrooms. We…
Mojo Homes
Not a builder, but have read a fair bit into the flooring. For floating floors - definitely floring first, then skirting goes on top to hide the 10mm gap they…
Mojo Homes
We have our colours pre selection walkthrough tomorrow, will let you know!
Advice for cut and filling sloping block
We are building the Verve 25, which will have a 600mm split at the front of the house and a lower set garage to reduce the incline on the driveway.…
Advice for cut and filling sloping block
We are building the verve 25 - we wanted the bohemia 29 but the extra site costs ate into our budget. the $25k is a "Provisional allowance - provide an…
Advice for cut and filling sloping block
G'day,
We too are building in Newy with a sloping block - I think I saw you post in the Mojo Homes thread. Where abouts are you building? We are at…
Sleek Concrete Caeserstone
G'day,
We are also planning on the sleek concrete - any idea of the cost difference between this and the standard range?
Cheers, Mort.
Mojo Homes
Thanks for your replies.
We are having family do the floors, should be able to get the flooring for cost and then out of pocket for their labour. It was them…
Mojo Homes
G'day,
Wife and I paid the $3k deposit this week, not making any structural changes to our Verve 25 so hopefully everything can progress quickly prior to our land registering around…