1 year1 yearMirrmu83Mirrmu83 posted:
My builder made the wrong height door, what should I do next

who do you have contract with?

1 year1 yearMirrmu83Mirrmu83 posted:
Builder used the wrong concrete mix

surely if signed contract for 25mpa (both parties), then builder cannot just simply say I have re-engineered slab and everything okay

2 years2 yearsMirrmu83Mirrmu83 posted:
Urgent!!! Bathroom walls

yes
and how will go for bathroom fixtures

2 years2 yearsMirrmu83Mirrmu83 posted:
Acrylic render: Dulux or ROCKCOTE

Rockcote suggest primer (tinted) if don't paint/seal after texture. Painted walls at the end is best outcome.
Hydrotech is most likely a silicone texture render, Dulux used to make one…

2 years2 yearsMirrmu83Mirrmu83 posted:
Acrylic render: Dulux or ROCKCOTE

yes, if you want dulux colour you need a dulux product. Rockcote do not have the base and tints that Dulux have.
the specification sheet for hydrotech recommends a sealer…

2 years2 yearsMirrmu83Mirrmu83 posted:
Acrylic render: Dulux or ROCKCOTE

hi,
need to get a scope of works from the builder/renderer first, generally most will not follow the specification from manufacturer.
If choose a Dulux colour you CANNOT get same colour…

2 years2 yearsMirrmu83Mirrmu83 posted:
Builder ignore after PCI, What to do

have you received final payment notice

2 years2 yearsMirrmu83Mirrmu83 posted:
Trade quotes in Builder's variation

havent found any info
can you help please ponzo, pretty please

2 years2 yearsMirrmu83Mirrmu83 posted:
Trade quotes in Builder's variation

why would the plan and engineering documents sit with the land?
a volume builder is selling a "house"

2 years2 yearsMirrmu83Mirrmu83 posted:
Advice on Building Inspection / Stages

what about inspection once builder issues notice of completion and final payment?

2 years2 yearsMirrmu83Mirrmu83 posted:
Boutique build schedule

thanks BIMGuy

2 years2 yearsMirrmu83Mirrmu83 posted:
Liquidated damages

the builder gave a Date for Practical Completion?

2 years2 yearsMirrmu83Mirrmu83 posted:
Liquidated damages

like you have pointed out above, definition for practical completion, practical completion stage, what is it?
Date for Practical Completion, what is that?

2 years2 yearsMirrmu83Mirrmu83 posted:
Boutique build schedule

good info BIMguy
would customer be in strong position to end contract and move on?

2 years2 yearsMirrmu83Mirrmu83 posted:
Liquidated damages

what is practical completion in the contract?

2 years2 yearsMirrmu83Mirrmu83 posted:
Liquidated damages

thats not the contract

2 years2 yearsMirrmu83Mirrmu83 posted:
Liquidated damages

what does the contract say?

2 years2 yearsMirrmu83Mirrmu83 posted:
Clause 37 - HIA contract - defects and Final Payment

If builder and owner signed at 37.0, then has to complete tasks on that list. 37.1 and 37.2 are what happens when no listed provided (37.1) or list provided…

2 years2 yearsMirrmu83Mirrmu83 posted:
Final Inspection and Final Payment Rights

Has the builder contested the defects? maybe, by not completing them first time around.
Reading Adeez comments, if going to rectify defects post handover, then agrees defects present.
Otherwise, builder couldn't…

2 years2 yearsMirrmu83Mirrmu83 posted:
Final Inspection and Final Payment Rights

ok, thats good
both parties can contest "defect"?

2 years2 yearsMirrmu83Mirrmu83 posted:
Final Inspection and Final Payment Rights

that will be good if sign defect list to be completed post handover
defects liability clause not for this purpose
what is a defect?

2 years2 yearsMirrmu83Mirrmu83 posted:
Plumber incorrectly installed kitchen drainage pipe

i think they have you on the merry-go-round.
the builder is where all needs to be resolved. need to be in the exact same position as if none of this occurred.…

2 years2 yearsMirrmu83Mirrmu83 posted:
Slab cracks

very confusing, is about surface water from titled land to the street?
1. (a) about engineering of footings

2 years2 yearsMirrmu83Mirrmu83 posted:
Slab cracks

anybody, what does this mean?
drainage system/s? completed by the finish of construction of the building> interesting

2 years2 yearsMirrmu83Mirrmu83 posted:
Frame broomstick cross beams

certification for your frame?? hope can get it
not framing code info or a sheet from pre-fab framing company

2 years2 yearsMirrmu83Mirrmu83 posted:
Builder not allowing us to do final practical inspection

ok good, so go through and put a tick or cross next to each item
of interest:
21.2(b)
21.3(a) OR 21.3(b)

2 years2 yearsMirrmu83Mirrmu83 posted:
Hebel + Polyfoam Construction

wonder how the couple in Toorak are going who went public with issues at LOW RISE apartment complex.
breached confidentiality agreement with Cladding Victoria, lots to spend still, be surprised…

2 years2 yearsMirrmu83Mirrmu83 posted:
Hebel + Polyfoam Construction

sorry, insurers do decline writing an insurance policy
literally millions of buildings that don't have bad cladding

Joined homeone
1 August 2019

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024