My builder made the wrong height door, what should I do next
who do you have contract with?
Builder used the wrong concrete mix
surely if signed contract for 25mpa (both parties), then builder cannot just simply say I have re-engineered slab and everything okay
Acrylic render: Dulux or ROCKCOTE
Rockcote suggest primer (tinted) if don't paint/seal after texture. Painted walls at the end is best outcome.
Hydrotech is most likely a silicone texture render, Dulux used to make one…
Acrylic render: Dulux or ROCKCOTE
yes, if you want dulux colour you need a dulux product. Rockcote do not have the base and tints that Dulux have.
the specification sheet for hydrotech recommends a sealer…
Acrylic render: Dulux or ROCKCOTE
hi,
need to get a scope of works from the builder/renderer first, generally most will not follow the specification from manufacturer.
If choose a Dulux colour you CANNOT get same colour…
Builder ignore after PCI, What to do
have you received final payment notice
Trade quotes in Builder's variation
havent found any info
can you help please ponzo, pretty please
Trade quotes in Builder's variation
why would the plan and engineering documents sit with the land?
a volume builder is selling a "house"
Advice on Building Inspection / Stages
what about inspection once builder issues notice of completion and final payment?
Liquidated damages
like you have pointed out above, definition for practical completion, practical completion stage, what is it?
Date for Practical Completion, what is that?
Boutique build schedule
good info BIMguy
would customer be in strong position to end contract and move on?
Clause 37 - HIA contract - defects and Final Payment
If builder and owner signed at 37.0, then has to complete tasks on that list. 37.1 and 37.2 are what happens when no listed provided (37.1) or list provided…
Final Inspection and Final Payment Rights
Has the builder contested the defects? maybe, by not completing them first time around.
Reading Adeez comments, if going to rectify defects post handover, then agrees defects present.
Otherwise, builder couldn't…
Final Inspection and Final Payment Rights
ok, thats good
both parties can contest "defect"?
Final Inspection and Final Payment Rights
that will be good if sign defect list to be completed post handover
defects liability clause not for this purpose
what is a defect?
Plumber incorrectly installed kitchen drainage pipe
i think they have you on the merry-go-round.
the builder is where all needs to be resolved. need to be in the exact same position as if none of this occurred.…
Slab cracks
very confusing, is about surface water from titled land to the street?
1. (a) about engineering of footings
Slab cracks
anybody, what does this mean?
drainage system/s? completed by the finish of construction of the building> interesting
Frame broomstick cross beams
certification for your frame?? hope can get it
not framing code info or a sheet from pre-fab framing company
Builder not allowing us to do final practical inspection
ok good, so go through and put a tick or cross next to each item
of interest:
21.2(b)
21.3(a) OR 21.3(b)
Hebel + Polyfoam Construction
wonder how the couple in Toorak are going who went public with issues at LOW RISE apartment complex.
breached confidentiality agreement with Cladding Victoria, lots to spend still, be surprised…
Hebel + Polyfoam Construction
sorry, insurers do decline writing an insurance policy
literally millions of buildings that don't have bad cladding