Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
meshelf
347 Posts
Likes
meshelf
347 Posts
Silver Member

Follow

meshelf

Joined 8 January 2016
Silver Member
Followers
7 years7 yearsCuttingEdgeKitchensCuttingEdgeKitchens posted:
Price to upgrade 40mm Caesarstone?

Yes there is an overhang for stools - if that is what you mean....? The design is like this island.

So "builder charge for this upgrade" is outrageous but in realm…

  ⋅  2
7 years7 yearsDU86DU86 posted:
Calacatta Nuvo Splashback

Thank you,
i've done 3 kitchens now, and this will be my last for at least 10-15 years..
the cupboards in my current kitchen are a Satin finish in Dulux Lexicon Quarter,…

  ⋅  1
8 years8 yearstechautechau posted:
Building the Metricon Fortitude 32

Upgraded with Metricon after Studio (for a cost).. we got them with translucent glazing.
To be stained same the same dark colour as our bi-folds and front door

  ⋅  1
8 years8 yearstechautechau posted:
Building the Metricon Fortitude 32

So today we seen a lot of progress (still no tiles) but when we see the amount of work done, still happy with the latest work.
Above is a photo of…

  ⋅  2
8 years8 yearsNeville SNeville S posted:
Metricon Mantra 29 - Adelaide Hills

Use fake grass, pebbles or plants in square pots, both still allow the water to flow. I am looking at the same thing.
My Journey
H1 thread |

8 years8 yearsmantra29mantra29 posted:
Metricon Mantra 29 - Adelaide Hills

A few finishing touches still to take place but coming along nicely. The plumber has finished the outside taps now, the waste was laid yesterday along with the installation of…

  ⋅  1
8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

Driveway was formed up today. They are hoping to pour Fri or Sat depending on the weather.
We are getting an exposed aggregate similar colour to the road


Nearly moved…

  ⋅  2
8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

Yep all here. I think they look pretty good considering they didnt break the bank. They worked out $103 each on special.
They could be a bit tricky to clean…

  ⋅  3
8 years8 yearscat_dunccat_dunc posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

Did the chairs arrive? How do they look?

  ⋅  2
8 years8 yearsjodgejodge posted:
Ikea Robes

Hello!
We're building a rustic/Hamptons style house (weatherboard, reclaimed flooring, white painted pine panelling etc.)
We're fitting out our WIR using Ikea PAX and METOD (the kitchen range) as well as a…

  ⋅  2
8 years8 yearsRyalls_first_buildRyalls_first_build posted:
Ikea Robes

It is!! My little must have lol
$75 for the draw / inserts $25 for the glass tray

  ⋅  1
8 years8 yearsRyalls_first_buildRyalls_first_build posted:
Ikea Robes

Mine were about $950 a side

  ⋅  3
8 years8 yearsvonsta76vonsta76 posted:
Ikea Robes

I paid $1410 at ikea for the robe. Would have cost me $3000+ for something similar going custom, and that would have been standard white. The shoe shelf wasnt from…

  ⋅  3
8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

Electricians were back Monday to finish off a few things.
Finally here are some pics of the pendants!
I really like the kitchen one's..
Just think its maybe a bit much with…

8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

Yeah chairs are so expensive... if only we were millionaires, imagine how much fun it would be decorating! The chairs come tomorrow so I'll take a pic.

  ⋅  1
8 years8 yearsMarshall5858Marshall5858 posted:
Building with Simonds in Adelaide

We've had some deliveries! Yay!

The 6-slider

Windows

We also have a skip now too, although it's already been half filled (illegally)
We were also informed today that the block next to…

  ⋅  7
8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

After a whole week of cleaning from ceiling to floor & washing lots of new towels & linen I've had stored till "the new house" , we will be starting…

  ⋅  2
8 years8 yearslozza81lozza81 posted:
Our KDR journey on Lake Macquarie- XMAS HANDOVER

After a hectic week, floors are fully down! Our friend did an awesome job and hubby worked hard too as his apprentice lol.
Now for the cleanup. Dust is everywhere..…

  ⋅  1
8 years8 yearshillbuilderhillbuilder posted:
Fairmont Homes - Flagstaff Hill SA

Background
Well I have been lurking on these forums for some time gleaning information - so hopefully I can put back some thoughts that can help others.
We have lived in Flagstaff…

  ⋅  3


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024