Building a Doulton in Geelong
Thank you so much for your reply. There’s so much homework to do before Studio M appointment.
Before, during and after! We had 13 resent quotes, as we changed, added or…
KDR - Rawson Balmoral (Modified) Sydney NSW
Demolition
The original house was of double brick & tile construction with two bedrooms and the original kitchen and bathroom. We purchased the property with the intention to knockdown and rebuild.…
How often do you visit your site?
I'm wondering if anyone has got confirmation on visiting their new build during the COVID restrictions. My suburb (Victoria) is back to Stage 3 restrictions and I want to visit…
Leaking tank? Maybe something else?
I've got a buildup of moss or something around the bottom of my tank.
Concerned it might be from a leak, possibly just bad drainage.
How do I 1) check…
How long should grout last for?
Thanks for the replies - as I suspected, I thought I was out of luck, although the two quotes I've had so far both have commented that the job was…
Wrong size of shower niche
The Niche size is an extremely common occurrence with ALL builders, they build the frames size to 600x400 and do not allow for linnings, waterproofing tiling and glues. This is…
Building with Hall & Hart Homes
Hi Guys
We have gone to tender with H&H, having chosen the Elyse 42 with modifications taking it up to 45sq
The design is pretty heavily modified, where the facade is like…
Building a Doulton in Geelong
It definitely looks good now, have you signed off on studio estimate? We might do that next week.
by Leafbusters