5 years5 yearsLouise Robinson posted:
New build - provision for a gas fireplace.
New build - provision for a gas fireplace.
Would also love to know!
5 years5 yearsLouise Robinson posted:
How often do you visit your site?
How often do you visit your site?
Is your new house located in one of the hot spots too?
5 years5 yearsLouise Robinson posted:
First Build HGWA- Rivervale
First Build HGWA- Rivervale
Taylor your home is so beautiful, absolutely love the upgrades!
5 years5 yearsLouise Robinson posted:
Before you sign .........
Before you sign .........
This thread has been so helpful. Thank you!!
5 years5 yearsLouise Robinson posted:
Thomas Archer Hive 46 (customised) Build 2020-21
Thomas Archer Hive 46 (customised) Build 2020-21
Thanks for the tips!
5 years5 yearsLouise Robinson posted:
Building Bayside : Our Glendale 45
Building Bayside : Our Glendale 45
I love the fit out! Our study is so crowded and this would be a dream in the new place.
5 years5 yearsLouise Robinson posted:
Metricon Sentosa 52 Modified
Metricon Sentosa 52 Modified
This is incredible, gotta show hubby!
5 years5 yearsLouise Robinson posted:
Thomas Archer Bayside Build
Thomas Archer Bayside Build
Amazing journey, thanks for sharing. Im so excited to begin ours!!
5 years5 yearsLouise Robinson posted:
How Long To Change Surveyor
How Long To Change Surveyor
Interesting, 30 days is an eternity! I would love to know too as we're about to embark on the same journey.
Joined homeone
24 June 2020