Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Likes
Kika
43 Posts
Junior Member

Follow

Kika

Joined 3 June 2017
Junior Member
Following
16+
Followers
6 years6 yearsshazawshazaw posted:
Landscape design - KDR (sekisui house ) Burbank - ST George

Sweet Viburnum will be place along the back fence to block out neighbour’s bedroom and their outdoor living area. Good for both side.
The photo below was taken from my sister's…

Landscape design - KDR (sekisui house ) Burbank - ST George
  ⋅  1
Landscape design - KDR (sekisui house ) Burbank - ST George
  ⋅  3
6 years6 yearsshazawshazaw posted:
Landscape design - KDR (sekisui house ) Burbank - ST George

Young teenagers Lilly pilly arrived this morning. So healthy and vibrant.

Landscape design - KDR (sekisui house ) Burbank - ST George
  ⋅  1
6 years6 yearsshazawshazaw posted:
Landscape design - KDR (sekisui house ) Burbank - ST George

Rhaphiolepis are doing well and I have placed red flowering pigface in between rhaphiolepis.

Landscape design - KDR (sekisui house ) Burbank - ST George
6 years6 yearsshazawshazaw posted:
Landscape design - KDR (sekisui house ) Burbank - ST George

Side of the house, from fence to wall is only 1.2m so not much room to work with. I can only place small pot plants hook on wire fence. This…

Landscape design - KDR (sekisui house ) Burbank - ST George
7 years7 yearsaloenyxaloenyx posted:
{Dawn} SE Melb Build - Done and dusted!

How gorgeous is this girl? My beautiful Cassidy and the best behaved of the lot XD
Next door got their roof today! So quick,their frame went up in two days!!
This…

  ⋅  1
7 years7 years1sttimer_stoneridge1sttimer_stoneridge posted:
Building with Homes by CMA - Ascot 260

So, the internet is still not fixed. They still have no idea why. They think it might be related to nbn co not finishing the job because they didn’t install…

Building with Homes by CMA - Ascot 260
  ⋅  1
7 years7 yearsaloenyxaloenyx posted:
{Dawn} SE Melb Build - Done and dusted!

So managed to do a bit of a spring clean outside. Sun is out for the afternoon :)
I've cleaned all the windows inside and out to…

  ⋅  1
7 years7 yearsgemm01gemm01 posted:
Simonds Prague Modified SA

Cabintry all installed and even got a surprise with the tiling being started!

7 years7 yearsaloenyxaloenyx posted:
{Dawn} SE Melb Build - Done and dusted!

Thank you all for your kind words. I go up and down a bit, but I'm on a bit more stable ground today. Being sick has definitely not been good…

7 years7 yearsgemm01gemm01 posted:
Simonds Prague Modified SA

Another progress shot! Spoke to the contractors there and they said tomorrow should be when they pour the slab! Very exciting 😁😁😁

Simonds Prague Modified SA
  ⋅  1
7 years7 yearsstephy2457stephy2457 posted:
Building Simonds palisade with 16m frontage study upgrade

Had a walk through today things looking good the kitchen is starting to come together we found out we hate our benchtop to us seems so messy looking was expecting…

7 years7 yearsbeac_faithbeac_faith posted:
Our new family home Metricon Metro 32 QLD

So today hubby painted a wall for the first time in his life. Got to say he's done quite an amazing job more feature walls to come
Before
After

  ⋅  5


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024