Henley Monterey 34 with Mods - VIC - Site start 17/7/18
Hi All,
Figured it time to start a topic on our 2nd build with Henley. 9 years ago we built the Henley Cooper. We unfortunately outgrew our 590sqm block. My husband…
Building an Aegean230 with Mainvue.
The siting of the house gives so much natural light into the living areas.
Kitchen:
Island Bench:
Undermount Sink:
Stacker Doors:
Windows cleaned:
Master window fixed:
My boy checking out the view from his room:
Very happy with…
Building Mainvue Aegean430 - 45sq in Berwick Waters
So we had NHP today and I think it went pretty well. Darbecca also did their thing and found 25 items which apparently in a double storey of our size…
Henley Electra 2017/2018 build
Hi Silver 75
I understand where you are coming from and agree that they are most likely understaffed. Their designs are nice (better than Metricon or others).
I have paid a…
Palace 41 Dream Home
Hi All,
Firstly thanks to all those who have come before us and posted about their Henley build, especially those building the Palace (we seem to be a smallish group).…
Building Mainvue Aegean430 - 45sq in Berwick Waters
House is looking very stylish and coming along nicely.
Your not far off now but just checking do you have your gasline and meter in yet as there is a delay…
Building Mainvue Aegean430 - 45sq in Berwick Waters
Soooo today marks 34.5 weeks or 242 days and the best I’ve got is an estimated NHP of 30/5. The build is still moving at a snails pace so…
KDR Henley Reserve (MainVue)- Aegean 38
We are exposed........
Front fence has come down and now we are in hell waiting on the gas line and meter to be installed before Henley can do the driveway.
So this…
Building Mainvue Aegean430 - 45sq in Berwick Waters
Garage doors complete.
Our Henley Aegean45
Building Mainvue Aegean430 - 45sq in Berwick Waters
Week 30...
It’s been a while between posts as not a whole lot was happening.
Henley couldn’t source the kitchen sink but found one eventually, then I needed to reselect ensuite basins…
Building Palace 33 with Henley in West Mel
I am currently building Palace 33 with Henley, and now it is in construction stage.
I have got great help in the forum by viewing people's experience, and inspired…
KDR Henley Reserve (MainVue)- Aegean 38
Another day and the garage door was delivered or so the postie told me and then proceeded to tell me that it's the wrong colour. Ok Babe, - can you…
Building Henley Palace Lux Q1 5BR with MODs in West MEL
Last week we finally moved out of Admin and into Construction
Today I have received notification from our Construction Supervisor that ground works will start this…
KDR Henley Reserve (MainVue)- Aegean 38
Can't believe that it was just over a month ago that we finally made a decision on our flooring. We decided last night that it was time to put…
KDR Henley Reserve (MainVue)- Aegean 38
Another day of torture for my poor Hubby - getting another quote for the outside. I have to say that if we get all of the quotes in that this…
KDR Henley Reserve (MainVue)- Aegean 38
Another day, another quote.
Out at the house today for a quote on concrete, patio and just for the hounds - instant turf.
Turf has been a big thing for me…
KDR Henley Reserve (MainVue)- Aegean 38
We got in - tilers were onsite this morning so after we got review of outside for a quote, we were able to get in for a look around.
Have to…
KDR Henley Reserve (MainVue)- Aegean 38
Caught up with our SS today and apparently we have had mirrors installed, and alarm is installed and as we already know the legal point of discharge is in.
Next week…
KDR Henley Reserve (MainVue)- Aegean 38
Today there has been some work completed at the house, so Hubby reported.
With the desperate of a thief after the Crown Jewels, I flew from the train station to…
KDR Henley Reserve (MainVue)- Aegean 38
Went to the house yesterday to get a quote for concreting but concreter was held up with previous jobs and we will need to re-schedule.
Whilst we were onsite the downpipes…