Things you forget - summary page 32
You can pulldown a downlight and change setting (no need to go up into the roof)
Building at Bardia - New Breeze
The noise is significant and disturbing. Imagine being in same room as a lawnmower running. You will end up playing loud music in your house all the time especially when…
Structural problem or not
Post some more photos that give a perspective, some from a distance that show good part of the wall
Rain water tank - leaking
Your builder must have given you a handover file/folder. That should contain supplier details, warranties etc.
Ask a lighting design engineer - general Q&A
If single storey home, then you can do downlights (without much headache). Standard lights are great and have been so for decades. Make sure you have enough of those in…
Building at Bardia - New Breeze
Driveway - Scott 0409 833 846
Fence - Liam 0421 515 668
Building At Macarthur Heights (UWS Campbelltown)
If you decide to do the flooring urselves (after handover) make sure you have actually decided on what type of flooring you want even before the builder finishes your house…
How long is the wait until slab goes
max 3 weeks assuming land requires cut/fill and prepping.
Building at Bardia - New Breeze
This is more or less what we did. We put in (cheapest) real grass without prepping the soil. Pictures of the landscaping (front, rear, side) were emailed to certifier who…
How to arrange landscape, pool, driveway and flooring quotes
The quotes are indicative and advise bank that you may change the tradie (flooring, pool) later on. That should not be a problem.
Recommend security cameras + supporting system
The software will allow you to control the NVR fan, however it is best left to the default. The fan and the storage hard disk are behind the inevitable hum.
Private Certifier providing Documents for OC
Isn't the PC just another tradie/agency chartered to do a job by the builder? The builder should provide all documentation.
Building at Bardia - New Breeze
I have seen a post elsewhere on this forum..the authorities have declined to put-up any sound barrier. They cited the surveys and development rules and advise that each house should…
Building at Bardia - New Breeze
For colorbond type fence, LIAM 0421515668
Tender help !!
Some tips (every little helps)..
1) ask for list of things NOT included (e.g. driveway, external balustrade, cost of electric connection/meter, council charges relating to approval of plans, council cost relating…
Inclusion/studio vouchers - What would you use it for?
Consider
- increasing internal ceiling height to at least 2700
- increase ward robe door height if you plan to store suitcases
- increasing garage door height (if you have or will…
Smart Lighting Design - Suggestions / Consultants
Further argument in favour of Zigbee
Smart Lighting Design - Suggestions / Consultants
I am sharing my 2 cents of Smarthome choice of components that I have implemented in my home -
Hub - I have Samsung Smartthings Hub. This supports Z-wave (make sure…
Land orientation good or bad?
Alfresco, Living, Kitchen' laundry will get good sunlight (and heat in summer).
Evaluate the possibility of switching the location of Garage and Theatre. In current setup Theatre will not get…
Stockland Elara at Marsden Park
Private inspection is discretionary. It is best if inspection is done at 4-5 stages of the build (slab, frame, lockup etc..) so defects can be identified and addressed there and…
Stockland Elara at Marsden Park
If you are building a house, then it is recommended to engage the inspector throughout the build.
In case of purchase of existing property, the inspector should be engaged prior to…
Building at Bardia - New Breeze
No wonder the quarter acre lots are slow to sell.
New Breeze, Bardia, Edmondson Park
You should also evaluate the high/constant level of road sound from the highway just behind these "premium" lots.