Who else is building at Oran Park?
Timber/colorbond fence Mohammad - 0449559596
Excavator hire, call Wayne http://www.taghire.com.au/ he has small excavator and dingo for narrow access.
Very happy with their work.
Who else is building at Oran Park?
I used Westglass in Narellan. Very happy with their service and pricing.
Who else is building at Oran Park?
I called Opticomm after moving in, paid $330.
Who else is building at Oran Park?
Drive around the estate, see a brickie, ask him. Works way cheaper than calling someone specially to do the job 'cause then he needs to bring bricks, cement, sand, tools…
Who else is building at Oran Park?
I don't know how many cubes in 1 load but got this done at my place. 7 cubes removed from front, side and back. $880 for bin hire and $1000…
Who else is building at Oran Park?
I am appalled by the driving I notice in and around Oran Park area, its mostly tradies with utes . Over speeding, cutting off, u turns & right turns where…
LED down lights after construction
$14-$15 to buy each downlight + sparky charged $15 to install.
If you're building in Sydney area, PM me and I can share my electrician's number with you.
Who else is building at Oran Park?
Yes, driveway is mandatory for interim OC.
Who else is building at Oran Park?
So, the premier was at Leppington station yesterday. Considering the growth in the area, they have announced more train services to the city and western suburbs.
https://www.transport.nsw.gov.au/newsro…
Who else is building at Oran Park?
Cuong 0414 898 133
Moosa 0412 401 577
Who else is building at Oran Park?
I purchased my block in 2014 and they were explicitly advertising it during the land release.
Who else is building at Oran Park?
You can do that.
My block is 30m long. As per their guidelines, side fence can go only 1/3rd of the length of block i.e. 10 m.
I phone them to ask…
Who else is building at Oran Park?
I can highly recommend Tarek 0431 342 210.
He installed security screen doors for alfresco and fly screens at my place.
Very reasonably priced, I got quotes from others too but his…
Masterton Homes - The next thread 4.0
I paid $250/Sq m. The guy is based out of Bankstown. Average waiting period for installation is 2-3 weeks.
The shutter made of PVC and comes only in white colour.
PM…
Who else is building at Oran Park?
Hi Sandra, do you happen to know their contact number? Google doesn't yield anything.
Who else is building at Oran Park?
hi,
I am looking to hire someone with a small bobcat to level and prepare the land for landscaping.
Can anyone recommend me someone please?
Masterton Homes - The next thread 4.0
In our build, M had hired a 3rd party inspector who issued the IOC. Council was no where involved.
Also note, M pays for 1 inspection only. For each subsequent visit,…
Who else is building at Oran Park?
Interim OC is sufficient for the home design rebate. You can claim home design rebate first and the landscape later on if you wish.
Who else is building at Oran Park?
Thank you Sandra for sharing his details. Had called nearly 10 fencers, got nothing but disappointment. Finally, Mohammad came for a rescue. His lads did a good job and at…
Who else is building at Oran Park?
This Mario guy is very hard to get to. I have called him almost 30 times if not more (no kidding), left voice message , texts and all that.
Never showed…
Masterton Homes - The next thread 4.0
hi Sandra, I paid for my lock up progress claim around 30 June and had PCI 28 Sept. slab was poured on 1 March.
Masterton or Clarendon?
I tend to agree with the comments above.
The neighbor just across me, built with C and moved in 3 months before me. We're both from same land release and it…
Who else is building at Oran Park?
Lets say your contract price is $150,000 and has 3 progressive payments of 50000. Now you have $15K PCV. Contract price revised to 165000, each progress payment becomes 55000.
So the…
Who else is building at Oran Park?
I paid about $18K on my own for my PCVs.
Builder invoiced me including PCV amount, however bank released the payment only per the original contract price (without including PCV…
Masterton Homes - The next thread 4.0
We got the keys (& towels) on Friday:-D.
Masterton Homes - The next thread 4.0
We were quoted $1,250 to moroka 4 pillars (25sq.m. area). Doing it post handover.
Who else is building at Oran Park?
That is the exact problem we had. Options were either to go via CDC and lose 5 sqm of our alfresco or go via council.
Our DA was lodged on 3/11/15…
Who else is building at Oran Park?
Our took about 4-5 weeks (but there was a minor issue with site coverage). You'll most likely see them online tomorrow or day after.
Masterton Homes - The next thread 4.0
The place where I'm going to buy mine, sells it for $15 each (13 for light + 2 for base). They are dimmable and comes with 5 yr warranty.