Who is building with Beechwood
Our sales guy (Tom) Attached the $22000 inclusions package, and then we deleted everything apart from the Stove, Stone bench and Microwave slot.
You can add any type of inclusion you…
Electrical Plan - Thoughts?
I recommend more data points. You will need data points in the future. WiFi wont be able to run at the highest speeds, more so if you have your whole…
Who is building with Beechwood
You will get a phone call by the colour consultant to book you in for colours and contract. Then you have to wait for the bank to send the letter…
Who is building with Beechwood
CDC look two weeks for us. The actual signing and approving the documents took one day. Bush fire report took a week and the Engineering took the longest at two…
Coral Daydream 32
Wow those tiles are amazing! Thanks for taking the extra photos for me. We definitely made the right choice there!
Who is building with Beechwood
Once you have full occupancy and the certifiers are happy and signed off. I assume you would have to go through your local council DA. As its still under their…
Coral Daydream 32
Hey Bec, Loving the house tread so far..
Im wondering if you could post more pictures of the tile floor? We are having the same in our house.
Thanks
Geoff