Building a Metricon Glendale 42 Limited Edition in Melbourne
It has taken a few months…. Mainly due to a 4 month delay in pavers, but the backyard makeover is finally complete. 💦☀️🍻
Thomas Archer Bayside Build
Long overdue updates - sorry
So, you know we baulked at the Thomas Archer joinery in the living room. Just didn't love the options and the cost wasn't fabulous either,…
Building a Doulton in Geelong
We are planning quite a few extra retaining walls everywhere, so we can level everything.
Metricon Riviera 54
Hi,
I visited a Riviera home that was under construction in Melbourne in January this year (2021). I think it was the 56 sq. version. My sales consultant was good enough…
Looking at Metricon Vantage 48 (H&L)
My experience was that the Metricon pricing is at least internally self-consistent.
We started with a deposit on a Designer range home, but changed our minds to a floorplan from…
KDR Metricon Liberty - Hampshire 45 QLD
Yeah I still pop on now and then.
House is great, nothing really to complain about.
Haven't had any issues I couldn't deal with myself, so no contact with M…
KDR Metricon Liberty - Hampshire 45 QLD
We got this picture on the front of our colour selections summary docusign doc:
viewtopic.php?p=1834174#p1834174
It shows the main render colour, feature render colour, front door, window frames,…
Building a Metricon Glendale 42 Limited Edition in Melbourne
Special delivery today….
Building a Doulton in Geelong
Not sure yet, will wait and see what it all looks like when finished. Probably some garden at the front and/or side, still looking at options for the other side…
KDR Metricon Liberty - Hampshire 45 QLD
You're most welcome.
It's a manhole to the lower roof space.
Good luck on your journey
Thanks for still being around in the forums! It is most helpful.
How has those two WIR in…
KDR Metricon Liberty - Hampshire 45 QLD
You're most welcome.
It's a manhole to the lower roof space.
Good luck on your journey
Good to see you are still on the forum mate.
How's the house going ? Any issues…
Building a Doulton in Geelong
Getting there! We had our frame completed two weeks ago, wrap done, sand arrived, ready to start bricks next!
Building a Doulton in Geelong
Tiles on today! Finally the floor will dry out, since it's supposed to rain for the next week!
Thomas Archer Hue 42 Bayside Build - 2020/21
hi everyone! thought i would share with you some pictures of our landscaping and a few from around the house. we've had most of our post handover stuff complete now.
We…
Building a Doulton in Geelong
A week and a half with no obvious activity, just a few wall boards put up!
Thomas Archer Hue 42 Bayside Build - 2020/21
Just in time for lockdown 4.0 our new dining table arrived - we designed and commissioned our stonemason Rococo Stoneworks to create this piece of 3 meter magic for us…
Building a Doulton in Geelong
Floor joists done, moving onto doing the floor next (weather permitting, forecast showers & windy)!