6 years6 yearsAKNJ posted:
List of things to consider
List of things to consider
Hi All,
We have signed up for building a new home with Eden Brae at Oran Park. There is a detailed list of things that…
6 years6 yearsNorfolk posted:
Building with Metricon
Building with Metricon
Our build time with Metricon was 85 weeks for a Liberty 45 in Sydney. The contract time was 42 weeks however this was meaningless because the liquidated damages for delays…
6 years6 yearsNorfolk posted:
Building with Metricon
Building with Metricon
I had to use a lawyer to assist in dealing with Metricon last year when I identified multiple serious defects in their work about 2/3 of the way through the…