Henley Electra 2016/2017 build
My house is south facing. If you put a door it will be big enough for guests. Just not a big room. I also have the 2720 ceilings.
Henley Electra 2016/2017 build
I am having my tv on that wall. I haven't got it set up yet but I just set the couch up so I will send a photo when I…
Henley Electra 2016/2017 build
Handover and flooring have been completed. Just been cleaning as there is loads of dust over the floor. So will have some pictures very soon.
Henley Electra 2016/2017 build
Well the supervisor was good about all the issues but we will see what gets fixed
Henley Electra 2016/2017 build
Some are fixed and the rest are being fixed before handover.
Henley Electra 2016/2017 build
Handover in 2 weeks and flooring to be installed on the following Monday
Finally got access for photo of the walk in robes
Bathroom handles replaced. Looking much better
Henley Electra 2016/2017 build
New home presentation booked for Thursday next week.
Looking like they haven't fixed any of the issues I've asked multiple times to fix. Also some things are still half finished.…
Henley Electra 2016/2017 build
The kitchen is white Attica (cat 4)
And the bathroom is fresh concrete (cat 2)
Henley Electra 2016/2017 build
Temp fencing removed. Site clean up completed, garage door installed. All fit offs complete. Only small jobs left to go. Finally I have been locked out.
Henley Electra 2016/2017 build
Plumbing fit off
Render painted monument
Stair balustrade stain charcoal
Henley Electra 2016/2017 build
The handles were about $23-25 per handle. And the wall colour is diesaku (half strength). We got it throughout the whole house. This is our third house with that colour.…
Henley Electra 2016/2017 build
We went with no cost facade. And added no render, only render is what they required us to have over alfresco and garage. I think it's called Elle facade. But…
Henley Electra 2016/2017 build
No handover dates yet. Still need carpentry and plumbing for off. Then they might bring it up. Getting close though.
Henley Electra 2016/2017 build
Shower screens
Pantry
Render, not yet painted
Kitchen
Henley Electra 2016/2017 build
Kitchen and laundry handles installed today. Unfortunately they installed the wrong handles in the ensuite and bathroom so I will upload pictures when they replace them. Bench tops apparently being…
Henley Electra 2016/2017 build
Our flooring is just under $12k. The quality is much better than the Henley stuff. We got good underlay, good laminate timber flooring and good carpet. You get to choose…
Henley Electra 2016/2017 build
Grouting completed except powder room
Henley Electra 2016/2017 build
Just go while trades are still on site. Also the bricklayers leave absolutely everything wide open. Sometimes you can't get in, but I've found mostly I can.
Henley Electra 2016/2017 build
Cabinetry install
Kitchen
Laundry
Ensuite
Main bathroom
Powder room
Tiles are meant to start tomorrow.