Builder connecting our new toilet for his trades
its a toilet. its for $hiting in. Like i said. pick your battles. Tehyre also walking on teh floors they are installing and washing their hands in sinks. Why ssnt…
Electrical question - Under cabinet LED strip, double GPO
Thank you chippy
Appreciate it.
Just to understand your point. Is the below what you mean?
Thanks
Yep, that's what we normally…
Electrical question - Under cabinet LED strip, double GPO
Most drivers come with a plug and lead already attached. It's easier for the sparky to do the prelay and terminate it with a socket, then the cabinet maker can…
Corner kitchen Cabinet gap - not flush - is this acceptable?
The gap can be adjusted so it's tighter.
You can definitely set up corner cabinets to have the same gap as standard doors.
Caesarstone bench join
Normally you would have a small filler in the corner so the dishwasher door doesn't open straight down the face of the other cabinet doors. This filler then gives you…
Heat Pump HWS - Perth, WA
We've currently got a 160 litre gas HWS.
Thinking about looking at a heat pump system.
Anyone with any experience of one who could give me their impressions and an idea of…
Frame broomstick cross beams
I'm going to stop commenting on this now as it is doing a disservice to the OP and any who may be interested in this thread in the future.
They had…
What's wrong with my cabinets
I sent you a PM but for others.
The drawer should simply be adjusted up so it sits level with the end panel. That way it would cover the white carcass…
Thomas Archer homes-Island Problem-Stone Not "Book Match"
I've got to say, if that's what you're complaining about, I would hate to be your builder.
Who should pay here? LL, Tenant or REA?
this seems like should be posted on whirlpool
where you will get the answer you want
Disgruntled with Metricon and Pre-Site Manager process
In the news today, Metricon is selling off their displays trying to raise 65M
In the last 12 months nearly 4000 companies went broke and 28% were related to construction
In the…
Building delays
On this topic - our build is, or will be very shortly, over the contracted 250 working day limit with no prospect of completion in sight. Not even at lockup.…