KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
Wow those staircase lights look great, great idea Steve
And that wall paper has really transformed the bedroom. Where is the TV and Sonos?
Smart Meter -good or bad ?
If you have a choice, there is a few things to consider. Your electricity suppliers would have a preference. I think we fall under endevor. Also if you're planning to…
Rawson Edge 39 MKI - Lake Macquarie
Yeah we had the shame issue. Get straight onto them. And tell them you're really worried. "Squeaky wheel gets the grease"
Rawson Edge 39 MKI - Lake Macquarie
Definitely go with Lifestyle store. They did all the prewiring before the gyprock when up and came back while the painters where here to finish off the install. They were…
Balmoral 34 MKI Majestic Facade (Syd) - Handover 16.11.15
Looks great, I've asked the wife to get some quotes too. Which company did you use? are you happy with them?
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Hi Simon,
Are you building an Edge too?
We original had the landscape 1000 quoted for around 10k but after looking at the display home in kellyville we saw the…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Good question. Right now the bottom of the trim is 26 cm from the finished floor level and bottom of the tv is 105cm. We had issues planning both sides…
Rawson Edge 39 MKI - Lake Macquarie
Wow those stairs and window looks amazing. Downstairs looks great too.
Rawson Edge 39 MKI - Lake Macquarie
We have 4 outlets, you really need 4 as the main family room is quite large and has lots of big windows. Did they upgrade the AC unit for you…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
So most of the landscaping is done and we have been joining our house for the last year.
Here are some recent pics
Night shot taken by a friend.
And a…
Rawson Edge 39 MKI - Lake Macquarie
Congrats guys, it all looks great. We fell in love with the Edge when we walked thru too. And now we have been living on the Edge for 12 months,…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
So its been almost a year and whats happened since. Well would you believe all the warranty items have not been completed yet. In March 2017 about half of them…
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
We had handover on wednesday and it wasn't included.
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
We have just done a bit of reading and our findings are:
our tender says Rawsons pays the OC fee,
Rawson contract seems to contradict that,
Our DA approved by Ryde Council…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Finally the day has arrived. Yesterday was key day for us with a successful handover from Rawson. All in all we are pretty happy with how it turned out. Pity…
Rawson Homes, Daikin A/C Zone set-up
I inquired about the upgraded panel with Rawson at our colours appointed (which is back in dec 2014). It was a $685 upgrade. I wish i did it at the…
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
Congratulations guys. Well done its looking amazing. We will be right behind you with our hopeful handover this Wednesday.
KDR Rawson Benham in Sydney
Thanks, it can be hard to see the big picture or appreciated it. Especially when you notice so many little mistakes. You get caught up in the small issues and…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
We signed up for optus cable and got a $20 off per month if the wife ports her phone number over to optus. This was good and all but optus…
KDR Rawson Benham in Sydney
In my experience Rawson have never met a date. All we got was empty promises from them and even with one week to go i dont think they will make…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
We are edging closer to handover this coming week. There has been a long list if items to be fixed. Most if which is fixing up a bad paint job.…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Its been a month since my last post and I'm very disappointed with the lack of urgency Rawson had put in. It was sheer luck we bumped into the head…
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
Guys, I hear you both and totally agree. Ive been shielding the naked truth till i get my keys. I was talking to a Tyrrels inspector today as he was…
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
Well its clear you need smaller pots and cheese gratter. Lol
KDR with Rawson Homes - The Edge 39 - HANDOVER 26/9/16
Good to hear you're moving forward.
Which material of shutters did you settle for? PVC or basswood?
Were you concerned with PVC emitting toxin's latter due to overheating in Sydney…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
We have a drive way. Its bigger than i expected and finished off pretty well. Only wish the colour could have gone all the way to the street.
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Thanks, to be honest we had a really hard time with colours and these colours were signed off late 2014. (lost 6+ months at council and the built has taken…
KDR - Rawson Edge 39 - Ryde - Completed Sept 2016
Ok there as been quite a few little things done. Tiling, painting, plumbing, kitchen, electrics and timber work are all 99% complete but would require maybe 5-10% rework. Some of…