I work in flooring - do you have a flooring question?
Hi Michelle,
Yes, when you walk on them. They are on second floor laid over chipboard. But it is not all over the room just in some places.
Thanks
The position of the stairs rail - Standard or Building code
Hi,
In a double story house and internal stairs with landing and a half wall between stairs dropping in parallel with the stairs drop.
I am wondering if there is an…
New build - bamboo floors installed - noisy
To: Althom
No idea - first time building house we didn't ask the builder. Sure will.
To: BrandonZoe
that's a worry...
New build - bamboo floors installed - noisy
Hi,
about two weeks ago we had a bamboo floors installed in our new build. The problem is that it's noisy when you walk on - like a "crunch" or "creaky"…
I work in flooring - do you have a flooring question?
Hi Michelle,
help please: we just got bamboo floors laid down in bedrooms and is very noisy when you walk on it in some parts of the room is this normal…
Shower bases will be bedded - what that means?
Thank you for reply.
I have additional question: in a two story house - can you build "hobbles" (I believe this is right word) showers on a top floor? We need…
Shower bases will be bedded - what that means?
Hi,
can anyone please explain what means "Shower Bases will be bedded so the floor does "fall" to floor waste.
Note in a building contract.
Thanks!
Building Inspector - Ask Anything
Thank you for the explanation.
Would following example be included in BCA 'standards':
if the window was installed 10 cm off to what its suppose to be as per the approved…
Building Inspector - Ask Anything
Thank you StructuralBIMGuy, will have a chat about this with my best half...
to wood bang
no, he didn't reference the applicable regulations and standards in his report.
He has a company,…
New build poor quality, so many problems
To TomCat: I do agree to "putting concerns in writing, with photographs of the problems..."
our experience: we stayed polite at all the times, backed up our concerns with evidence, put…
Plantation Bronte, Ormeau Ridge QLD - Post-Handover
Thank you Ilaeria . Great and sensible approach!
Again congrats and hopefully for us soon too.
Looking forward for further pick when you find time.
New build poor quality, so many problems
yep, I am in QLD but builder had answers on all the defects (how to avoid to do anything about it). Even questioned the credentials and asked us for the…
Plantation Bronte, Ormeau Ridge QLD - Post-Handover
Hi Jen
First Congratulations your house looks amazing.
New to your post (and read all of it) as I was searching about late hand over date. I…
New build poor quality, so many problems
Hi Sandy...
we are in similar situation. Builder - not cheap one.
We took the independent inspector which builder just brushed away: they are fussy... and didn't try to rectify any…
Ceiling heights - what to do?
where are you building?
hot climate high ceilings more south not so evident rather upgrade for looks
Sealing the gap between slab and path around the house
sorry no knowledge from me but I am interested to.
Building Inspector - Ask Anything
Thank you StructuralBIMGuy.
I agree with you but finance are short.
My biggest investment in my life became "too big". And we all know the starts: basic house price; and…
Master Builder Contract - building handover late
I hope you have some photos stored Arielbj.
We have now taken an approach that we document everything, with photos and notify builder through emails (even if they don't response) and…
Late Completion of Building-Question
Hi all,
same question from me under "Master Builder Contract - building handover late Post Posted: Sep 09, 2015 3:46 pm - see some answers.
Good luck!
Building Inspector - Ask Anything
Follow up on my questions and answers I received from the builder, building inspector and the Master Builders QLD association & would like to hear comments...
When all unfolded: after some…
Enclosed stage - money requested before it is 'enclosed'!
sorry if I am too late but we have experienced same situation and replied stage is not finished yet, documented with photos, ensured we had a site visit with the…
Master Builder Contract - building handover late
Thank you for the input.
I agree AJW.
I was surprised when I saw in a contract 25% interest on potentially late payment of stages while current bank loan interest is…
Master Builder Contract - building handover late
Thanks Bash...
We never received "offical letter" of the start date. Just letter with the council approved plans that they will have a meeting with us on-site within 10 days which…
Master Builder Contract - building handover late
Hi,
has anyone claimed late handover date.
How do you do that to overcome all the items specified in a contract: rain, trades not available... during the build we never received…
Mystery of the 3 copper pipes on a gas water heater
Thank you Gsp07R.
I'll try to get photo attached when I work out how...
Mystery of the 3 copper pipes on a gas water heater
Hi all,
can anyone tell me what 3 copper pipes pocking out of the external wall located below the box for the gas water heater are?
we have two gas water heaters…
Seeking Project Manager - review Builder's & Sub C's work.
Hi,
How did you go with Master Builders?
Thanks
Building Inspector - Ask Anything
yes if the inspector finds that standards are not being complied with.
Following on above; my builder is not happy I am engaging building inspector…
Insulation - External Walls question
thanks Ponzu.
Luckily builder doesn't have an issue for us to put the wall batts in by our self as long we don't hold them back with the plaster installation.
Insulation - External Walls question
Thank you oneJohn for prompt reply! as such I guess more money needed to put insulation in the walls .
We have only coming weekend…