Our build with Express Two Storey (Ventura) in South West WA
Most of the fencing and landscaping done:
Shed in progress too:
Our build with Express Two Storey (Ventura) in South West WA
Hey Aveley,
We have been in for a week, there is definately a difference in temperature from top to bottom. I would say it was quite noticeable on the weekend when…
Our build with Express Two Storey (Ventura) in South West WA
Ok so we have been in for a week! Its been crazy busy getting everything organised and set up, we dont have all the areas finished yet but here are…
Our build with Express Two Storey (Ventura) in South West WA
Had PCI on Thursday, we got an independent inspector to go through the day before and he picked up around 45 defects, mostly cosmetic.
One weird thing to note about…
Our build with Express Two Storey (Ventura) in South West WA
Laundry slider
Carpets going in
Nice to see the kitchen all finished up
Our build with Express Two Storey (Ventura) in South West WA
Blinds on, hopefully carpets are tomorrow
Our build with Express Two Storey (Ventura) in South West WA
Thanks! The barn track came from Richmond, its the "european" style one as opposed to the usual type with the long hangers.
Im not too sure on the planks, Im pretty…
Our build with Express Two Storey (Ventura) in South West WA
Ensuite slider:
Front door:
Still waiting for the carpet to start ⏳
Our build with Express Two Storey (Ventura) in South West WA
Vinyl plank is finished, carpets should have been started today but weren't
We've been told we are about 3-4 weeks away from getting the keys
Our build with Express Two Storey (Ventura) in South West WA
Flooring going in:
Our build with Express Two Storey (Ventura) in South West WA
Garage door on today!
Still waiting for it to be cleaned up and ready for the flooring, getting there slowly, should be happening Monday
Our build with Express Two Storey (Ventura) in South West WA
Painting almost complete and paving done all in 1 day!
Paint colours Taubmans Silver Spoon and Cotton Sheet:
Really happy with how its come out, there was a bit of concern that…
GJ Gardner - Twin Waters (slightly modified)
Good luck! Things are about to get very exciting 🍾
Our build with Express Two Storey (Ventura) in South West WA
Aircon installed
Mirrors and showerscreens in (big 2.9m mirror must have been a pain to get up the stairs!)
Downstairs
Painting for the rest of the week and paving soon too!
Our build with Express Two Storey (Ventura) in South West WA
We werent really too bothered about that and after 10k of upgrades in prestart I dont think we could afford it anyway haha
Our build with Express Two Storey (Ventura) in South West WA
So far, so good! No huge dramas with anything, I will keep you posted!
Our build with Express Two Storey (Ventura) in South West WA
Electrical going in today
Theatre
Our build with Express Two Storey (Ventura) in South West WA
Tiling is complete, on to appliances
Our build with Express Two Storey (Ventura) in South West WA
Ensuite tiling
Kitchen splashback (alot darker than we thought... hopefully it comes together when the stuff gets taken off the benchtop)
KDR - New Choice Homes Custom design - Perth, WA
I reckon the light colour was the right choice, should look great with your facade!
Our build with Express Two Storey (Ventura) in South West WA
Tiling in bathroom:
Laundry (& fingers)
Ensuite ready for tiles:
Our build with Express Two Storey (Ventura) in South West WA
Im not 100% sure of the process but I believe they do it under the screed... I think he told me the ensuite has two layers under screed and two…
Our build with Express Two Storey (Ventura) in South West WA
End of week 2 of tiling and not a lot done... 4 coats of waterproofing had to be applied to the ensuite though so that has contributed to the slowness.
Laundry:
Handrail…
Our build with Express Two Storey (Ventura) in South West WA
Tile meeting on monday
Benchtops in
Area under the stairs filled in
A bit better view of the front since the skip got moved
Still got rendering and painting of the cladding panel to…
Our build with Express Two Storey (Ventura) in South West WA
Garage slab poured last week
Shelving all in
Tub going in
Undercoating all happening today
KDR - New Choice Homes Custom design - Perth, WA
Congratulations! Finally at the finish line!
Our build with Express Two Storey (Ventura) in South West WA
You're definitely right about it being the most exciting part, I cant stop looking at the photos haha
Our build with Express Two Storey (Ventura) in South West WA
This cool little hidden cupboard in the bench
Laundry
Our build with Express Two Storey (Ventura) in South West WA
Busy today! Cabinets in! Love seeing the kitchen come together
Ensuite
Bathroom