Recessed sliding door is flushed to internal floor slab
I thought we had the same issue. They simply trim the bottom of the door upright frame things and it was fine
Hope this is the same for you
Floorplan dilemma on corner square block
5500 width garage could be a bit tight...
New build - drawings review
If feasable, you should consider widening your Garage. Park your cars side by side and see how they would fit. Good luck!
New Build - Weeks Building Group - Balhannah SA
Hi Black Duck,
All the best with your build!
Yes, we did flooring post handover, we too were worried about the skirting boards not being done in conjunction with the flooring. We…
ADH - custom KDR in Clearview. Countdown to handover!!
Having pendants in both the kitchen and dining can sometimes be too much i think anyway... Not having pendants in your dining will offer more flexibility going forward. Good luck!
New Build - Weeks Building Group - Balhannah SA
Hallway is 1845mm at the Entry then narrows to 1275mm down the hall - does feel quite spacious, we also have 1600mm nook in the hallway which adds to the…
New Build - Weeks Building Group - Balhannah SA
Hi Infra Red,
We did the Walk in Robe through Pakers, not the builder. Builder let Pakers install before hand over which was convenient (awesome Site Supervisor - Andrew). Have used…
New Build - Weeks Building Group - Balhannah SA
Update:
We have had hand over! Stacker door glass is going to be replaced with no safety etchings on it, as originally requested. Other than that its just some painting touch…
New Build - Weeks Building Group - Balhannah SA
Hi Monkey,
thanks, the tiles don't looked as 'cracked' in person... No haven't had any issues regarding the Easement, we don't plan to build anything beyond the top of the slope…
New Build - Weeks Building Group - Balhannah SA
Update:
3 Way Bathroom Tiling almost done
Stone benchtops in, bit worried as they are not as white as we thought. They are 'Ocean Foam' - from cheapest category, couldn't justify spending…
New Build - Weeks Building Group - Balhannah SA
Update:
Tiling should be done by next week
New Build - Weeks Building Group - Balhannah SA
Thanks Dan, yea we are quite chuffed with it, layout and size seem to be how we imagined
New Build - Weeks Building Group - Balhannah SA
Update:
Joinery all in, will be doing some more ourselves post handover
Not sure about the Front Door, hopefully it looks better once stained...
Waterproofing this week then tiling starts next week -…
Our First Home - New Build SA
Exciting times Code! All the best with the build!
New Build - Weeks Building Group - Balhannah SA
Provisional landscaping plan:
New Build - Weeks Building Group - Balhannah SA
Yes created the plan our self using the a free trial of Edraw. Its quite good once you get the hang of it. Was very useful for room sizing because…
New Build - Weeks Building Group - Balhannah SA
They actually dont cost all that much to upgrade considering the difference. So Weeks allow for a standard Sliding Door (2400h by 1810w). The additional cost to updrade this to…
New Build - Weeks Building Group - Balhannah SA
Thanks guys, should look a whole lot better once its all cleaned up...
New Build - Weeks Building Group - Balhannah SA
Hoping Bricking to be completed today, has taken a bit longer due to using the Brighton Lite White mortar
View down to creek out the back Stacker Door
New Build - Weeks Building Group - Balhannah SA
Progress - bricks are Austral Urban - Muscat Grey
New Build - Weeks Building Group - Balhannah SA
All the best HB, hopefully your pre-build phase goes better/quicker than ours did. Our actual build has moved along quite smoothly. Bricks are going up this week so will get…
Fairmont Homes Adelaide Custom Build
Hi Wilko,
Your home looks fantastic - congrats! Could you tell me are you happy with that style of light above your double vanity? Does it serve it purpose well? And…
New Build - Weeks Building Group - Balhannah SA
Update:
Windows and Stacker Doors in
Couple of issues:
1. Asked for ugly etched safety 0000 ring marker things on Stacker Doors to be replaced by stickers so we could peel them off…
New Build - Weeks Building Group - Balhannah SA
Update:
Slab laid and framing up
Hickinbotham Torquay Mod - Rear Verandah done
They look great! We are having the dowell black ones too but the are called 'Alfresco Stackers' - 2400h x 3600w. All the best with build!
Hickinbotham Torquay Mod - Rear Verandah done
Hi Entilzha,
looks great! are these the Dowell 'Alfrsco Stacker Doors' or just standard?
Thanks
Simonds Prague Modified SA
Hi Gem,
Congrats on your shiny new house! Question - did you get the builder to do the driveway/storm water/perimeter paving? If so, did you investigate price difference having it done…
New Build - Weeks Building Group - Balhannah SA
Another delay - slab not being laid until 1st of November now, apparently Site Works have been put on hold due to rain - it rained 20ml back on the…
New Build - Weeks Building Group - Balhannah SA
Hi benblinkau,
Will be keeping an eye on yours too - not many on this forum building with Weeks... We signed our contract back in March, so things have moved very…