Simonds Prague with Modifications in Melbourne's North
Sharing which might be one of my last updates.
Here's the timeline so far:
23-Apr - Loan approval
01-May - Land settlement
14-Jun - Construction start
01-Jul - Base stage
04-Jul - Frame stage
01-Aug - Lockup…
Simonds Prague with Modifications in Melbourne's North
Bricks were in placed. This was 2 weeks after the walling were up. The front pillars will still be covered with rendering.
Another 2 weeks after the bricks were up, floor…
Simonds Prague with Modifications in Melbourne's North
About 2 weeks after the roof tiles were in..
Simonds Prague with Modifications in Melbourne's North
@Dui2705
In our case, we didn't spend too much time going into details during contract signing. Apart from the drawings, colours and itemized specifications, the rest of the content in the…
Simonds Prague with Modifications in Melbourne's North
Frame was up..
A week later, roof tiles were in..
Simonds Prague with Modifications in Melbourne's North
Thanks
With regards to WIP door, you probably right, that door may end up open all the time. But that's fine, in case we'll have a pet dog one day, then…
Simonds Prague with Modifications in Melbourne's North
A bit of update on this post,
after two years of waiting and uncertainties since estate development was delayed several times, we have finally reached the land settlement last week.
With regards…
Building Simonds palisade with 16m frontage study upgrade
Hi Stephy, may I know about your tiles, is the bathroom tiles the standard simplicity sand? Looks nice, and is it the same tiles you use in living/dining area?
Building the Simonds Palisade in Gippsland
Congratulations! Your kitchen is very nice.
By the way, is that 20mm or 40mm stone benchtop? And is it 900mm deep/width with the 300mm overhang?
Simonds Prague Modified SA
Looking good! What's your facade by the way?
Simonds Prague with Modifications in Melbourne's North
Thanks for responding guys It really helps reading your posts.
@ I've been looking at your posts, really nice reading all the stories and viewing…
Simonds Prague with Modifications in Melbourne's North
Our house build will start sometime mid next year 2018 due to land title availability by next year but thought of opening a forum today. Below is our draft plan…