Building Arden Homes Genoa Verve 26 in North East VIC
Yeh we are, Arden have been quite good to us. Our supervisor has been great too which has made the process much better than it could have been. …
Building Arden Homes Genoa Verve 26 in North East VIC
Thank you!
The flooring is vinyl planks from Perfect Timber Floors in the colour Nevis. We also upgraded to "no quad".
Building Arden Homes Genoa Verve 26 in North East VIC
Interior Pictures
Here are some pictures of our nice and clean areas, most other bedrooms are full of stuff still!
Entry way
Master Bedroom
Ensuite (Still work to do on the shower, hence no…
Building Arden Homes Genoa Verve 26 in North East VIC
Most things are in now, I will see to some pictures when I am home tonight from work!
Building Arden Homes Genoa Verve 26 in North East VIC
Week 24
This will be the last "weekly" update as the house is now completed (except for minor maintenance and repairs).
This week has seen a number of "teething" issues crop up…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 23
This update is LONG overdue, mainly for the fact that we were handed the keys to the house on Friday (26/10/2018.) and we were frantically moving everything in and…
Inspired Homes/Como Homes - Handover
I am building with Arden and have a colourbond roof. My cousin who is a carpenter mentioned that my roof does not have sarking. When he brought it…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 22
As I had expected, we were again delayed for handover. On Wednesday (17/10/2018.) afternoon my site supervisor gave me a call and advised me that the ensuite showerhead…
Building Arden Homes Genoa Verve 26 in North East VIC
Typically Arden tries to have QA, then PCI a week later, and handover the week following. In theory this gives Arden enough time to fix up most issues raised…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 21
Given the lead up to handover, one would have thought that there would be a lot of action in getting this finished up. However this week saw little…
Building Arden Homes Genoa Verve 26 in North East VIC
Not to worry kathysangel, the pictures of our flooring were taken before the skirting boards were installed, it looks a lot more finished…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 20
Not a lot this week in terms of things actually done, but that is to be expected as most all things have been done. It is now just…
Building Arden Homes Genoa Verve 26 in North East VIC
They will not be moving in, it is just an investment property for them. I will mention this "storage condition" to the site supervisor though as they are still…
Building Arden Homes Genoa Verve 26 in North East VIC
Since handover hasn't happened, Arden will still need to replace the missing items. It's not my responsibility to ensure the house is adequately locked-up and that their trades are…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 19
So as I mentioned above, I caught up with our site supervisor this week. I won't repeat myself, so what happened is outlined in post 73. My…
Building Arden Homes Genoa Verve 26 in North East VIC
I double checked but yes it seems so. A final inspection of the property will be required by our bank prior to payment of the final invoice. Our…
Building Arden Homes Genoa Verve 26 in North East VIC
Met with the site supervisor today with regards to the shower screen. From what he showed me they have made the shower screen too big. To be honest,…
Building Arden Homes Genoa Verve 26 in North East VIC
Check out some of the pictures of the tiling in post 58. They essentially stuffed up the tiling for the shower by first installing the door frames in the…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 18
So week 17 was posted a week late, but I am posting this weeks a little on the early side!
So it was not till Wednesday that the flooring was…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 17
So this week (last week at time of posting) was meant to see the installation of our vinyl flooring. Unfortunately Perfect Timber Floors apparently did not receive the…
Building Arden Homes Genoa Verve 26 in North East VIC
Speaking of flooring, we should be getting our flooring installed today. I won't be able to go down and check tonight, but I will be for sure tomorrow. …
Building Arden Homes Genoa Verve 26 in North East VIC
I agree that the cost is quite ridiculous but we still believe it was worth paying to have the nicer finish we desired.
To be honest we did not think to…
Building Arden Homes Genoa Verve 26 in North East VIC
It really is a great house design imo. We have been very happy with everything for the most part, which is about as much as you can ask! …
Inspired Homes/Como Homes - Handover
If you get the framers in next week, I'd expect the frame to be up in as little as 2x days, it is amazing how fast those pre-fab frames go…
Building Arden Homes Genoa Verve 26 in North East VIC
Yeah I did think of this too! Maybe down the track it is an option, but we don't really have the money at the moment to invest in that.
Just…
Building Arden Homes Genoa Verve 26 in North East VIC
The Bad
This is what I see when I look up from under the fridge cavity. Straight up through those gaps into the ceiling... This is unfinished and needs to…
Building Arden Homes Genoa Verve 26 in North East VIC
The Good
The front door we have stained, it has come up amazing. There is a slight smudge on the front, but it is hardly noticeable and easily fixed with a…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 16
Things really picked up this week! Early in the week the painters finished (except for touch ups which will happen later). This was quickly followed by the caesarstone benchtops…
Building Arden Homes Genoa Verve 26 in North East VIC
Week 15
Even later than usual update... a week late actually... so that means time for two updates at once!
In terms of my memory, it is probably a good thing that…
Building Arden Homes Genoa Verve 26 in North East VIC
Yeah look, not great lol... I'm an accountant studying for my Chartered Accounting qualification. This "module" was for Financial Accounting and Reporting and is known to be the most…