Bathroom Renovations - Pleasure or Pain?
Bathrooms have certainly come under significant review over the past 10 years. New homes and bathroom renovations can produce bathrooms with stunning characteristics and visual appeal. From tiling, baths, basins, showers and tapware the choices and options seem endless. The general view that after the kitchen, the bathrooms are the most expensive rooms in the home is clearly understandable.
With this backdrop it is hardly surprising that many home owners embark on construction journeys to transform tiered and outdated bathrooms into the stunning and glamourous masterpieces often seen in the glossy magazines and home renovation shows.
When it goes well it can go very well. When it goes bad, it can similarly go very bad. The following are some simple steps that home owners should follow with their bathroom renovation projects.
Rule 1 – Research, research and research your supplier
Due diligence on any supplier is critical and can avoid costly issues. Do not just read the glossy brochures, dig deeper and call references. You need to satisfy yourself that the supplier can do the work, at the required standard, within the time frame and without unplanned cost overruns. Time spent on research before committing to the contract can save substantial sums and considerable angst down the track.
Rule 2 – Ensure your supplier builds by the rules
In all of your discussions you should emphasise that you expect the work to be undertaken in accordance with:
- The National Construction Code
- The Australians Standards
- Accepted standards of professional workmanship
Rule 3 – Understand the Home Building Contract Obligations
Where bathroom renovations are being undertaken, home owners must be aware that:
Contracts in WA for bathroom renovations which exceed $7,500 will fall under the Home Building Contracts Act in WA. There are important protections here that all home owners should be aware of. .Where the contract is for less than $7,500, home owners are encouraged to apply as much of the attributes of the contract requirements captured by the Home Building Contracts Act as is possible.
Key requirements of the Home Building Contracts Act include:
- Where the costs of the building work exceeds $20,000 or a building permit is required, a Registered Building Contractor is required to be used.
- Home Building Work includes:
- cabinetry or tiling work for a kitchen or bathroom
- similar type work
Contracts for the work MUST be in writing. Contracts must contain all the terms, conditions and provisions of the agreement, show the date and be signed by both parties. An oral agreement is not sufficient to comply with the Act.
- A home building work contract cannot provide for a payment of deposit prior to the commencement of work that exceeds 6.5 per cent of the total cost of the work
- Once work has commenced, any progress payment must only be for work actually performed or materials already supplied.
- Usually, any variation to a home building work contract is to be in writing, show the date and be signed by both parties with a copy given to the home owner before the variation work commences.
- A contract cannot restrict inspections except by limiting them to normal working hours or forbidding inspections that would unreasonably impede or interfere with the building work.
- Builders are liable to make good, at no cost to the owner, defects in home building work where notified in writing within four months of practical completion.
- Home indemnity insurance (HII) covers the home owner, and subsequent owners, against the loss of deposit (up to $20,000) or the completion or rectification of the building work (up to $100,000) should the builder die, disappear or become insolvent within six years from the date of practical completion. It is compulsory for all residential building work above $20,000 to be covered by HII, except associated work alone (eg swimming pools, carports, pergolas and landscaping).
Rule 3 – Understand that help is at hand
In the event that issues develop between you and your supplier, it can be beneficial to try and keep communications open so that the issue can be progressed through the resolutions stages. When resolution appears to have reached a stalemate, options to progress include:
- The WA Building Commission can deal with contractual disputes
- There are a variety of remedies defined within the Act.
So, the positive news is that home owners are afforded a degree of protection via the above. However, the real key is to avoid the problems in the first instance. Home owners should ensure that they:
Review the above information and the linked documents before you start on a bathroom renovation
Common issues that Houspect WA has identified in WA bathroom renovations include:
- Failure to follow plans, quotes, contracts
- Failure to get council approval (where required)
- Incorrect installation or location of fixtures including tapware, baths and basins
- Waterproofing membranes not installed as per required standards
- Failure to install floor drains or facilitate falls toward floor drains
- Cabinet work installed to a poor standard
- Substandard installation of shower screens
- Poor tiling
- Poor alignment of tiling joints
- Insufficient, excessive or inconsistent gaps between tiles
- Poor tile cutting
- Insufficient, excessive, inconsistent grout application and or grout colouring
- Excessive lippage between tiles and or adjacent surfaces
- Cracked tiles
- Incorrect floor levels
- Floor grates installed incorrectly
- Unprotected woodwork installed in wet areas
- Exhaust fans incorrectly installed
- Inappropriately located power points
- Substandard silicone application
Houspect WA can provide home owners with a broad range of support to their bathroom renovations including:
- On site consultations to review bathroom renovations
- Independent investigation reports which can be presented to suppliers and will articulate issues that need to be addressed
- WA Building Commission Complaint Reports, in the format required by the WA Building Commission, to support a formal complaint against the supplier.
Need more Information? Contact Houspect WA on Ph 9240 8855 or visit